Skip to main content

CH2M selected for Poland's Lower Silesia region's road design project

Poland's General Directorate for National Roads and Highways awarded CH2M a contract for the feasibility study for the expansion of the country’s 70 km long National Road No.8, which is intended to improve travel times for the 30,000 daily vehicles using the heavily-trafficked portions of the road. As part of the contract, CH2M will develop a corridor study, feasibility study (STEŚ), conceptual design for the selected best option and adjust the model functional and utility program. The feasibility study
February 13, 2017 Read time: 1 min
Poland's General Directorate for National Roads and Highways awarded CH2M a contract for the feasibility study for the expansion of the country’s 70 km long National Road No.8, which is intended to improve travel times for the 30,000 daily vehicles using the heavily-trafficked portions of the road.

As part of the contract, CH2M will develop a corridor study, feasibility study (STEŚ), conceptual design for the selected best option and adjust the model functional and utility program. The feasibility study will compare alternatives based on technical, economic and environmental factors throughout the project location and will include traffic analysis to reach an optimal design version of the route.

Related Content

  • Michigan DoT implements truck parking initiative
    September 9, 2014
    A new project is balancing up the needs of truckers wanting a break from the road and the availability of parking spots in Michigan. Commercial truck drivers typically require around 30 minutes to find somewhere to stop for a rest. They frequently find that the five public rest areas on the heavily-trafficked 129-mile stretch of I-94 in southwest Michigan, which carries around 10,000 trucks a day in the Canada-Detroit-Chicago corridor, are full.
  • MVIS VMS solution deployed on Highways England’s road upgrade project
    September 4, 2017
    Mobile Visual Information Systems (MVIS) has implemented its DATEX journey time solution (JTS) on Highway’s England’s US$1.9 billion (£1.5billion) A14 Cambridge to Huntingdon upgrade scheme, enabling an average of 85,000 drivers daily who use the 21 mile stretch of road to navigate the roadworks. The project incorporates 26 Bartco UK VMS-Cs variable message signs which display journey times from their locations to the end of the affected stretch of road
  • The proven route to safer roads from iRAP
    July 23, 2024
    Research from Johns Hopkins University suggests nearly 700,000 deaths and severe injuries were prevented over eight years in road safety projects which used the International Road Assessment Programme methodology
  • Systra's latest simulation model puts cyclists and pedestrians on show
    February 24, 2023
    Paramics Discovery 26 modelling software now allows active travel microsimulation