Skip to main content

Californian city deploys adaptive traffic management

The city of Arcadia in California has partnered with TransCore and KLD Engineering to install an integrated adaptive traffic signal control system that helps monitor traffic conditions and manage congestion in high traffic areas.
September 18, 2015 Read time: 2 mins

 The city of Arcadia in California has partnered with 139 TransCore and KLD Engineering to install an integrated adaptive traffic signal control system that helps monitor traffic conditions and manage congestion in high traffic areas.

With its proximity to Los Angeles and large event venues, the city wanted a better way to respond to both expected and unexpected traffic congestion.

The project was completed at the beginning of the school season, which typically causes more traffic as children head back to school. The adaptive system is currently operational at 33 intersections along several of the major corridors within the city.

These 33 intersections are operated as three control areas for variable-objective adaptive signal operations, a concept unique to TransSuite/ACDSS, and critical for successful implementation in a complex urban environment like Arcadia.

The city’s already heavy traffic is compounded by nearby activity centres, including the Santa Anita Race Track, the LA Arboretum, the Santa Anita Mall and Methodist Hospital.
To address increased congestion in these areas, the city developed an ITS Master Plan in 2015 to integrate its traffic signal operations with the LA County Information Exchange and participate in the San Gabriel Valley Traffic Forum project.

The city has been using TransCore’s TransSuite traffic control software since 2007 and over the years has expanded the system to use additional technologies and operational strategies like the ones used in Arcadia.  

“The City was able to introduce adaptive operations in a cost effective manner just by adding the adaptive component to their existing TransSuite system infrastructure,” said Travis White, TransCore associate vice president.

Related Content

  • Seamless ITS solutions from PTV and Gevas
    February 3, 2012
    PTV and Gevas Software have launched what they claim is a new and unique innovation - ITS seamless. As Michael Ortgiese, PTV's VP ITS Systems, explains, never before has there been such a range of seamlessly integrated intelligent transportation solutions and services which cover all processes, from offline and online modelling to control and strategy management, and individual services.
  • Ramp metering delivers - again
    January 27, 2012
    Though still controversial, ramp metering, which has been around for nearly 50 years, continues to deliver substantial benefits, and generally for relatively small cost. Kansas City is a case in point. In March 2010, Kansas City Scout, a partnership between the Missouri and Kansas Departments of Transportation to provide ITS for the greater Kansas City Area, activated the first ramp metering system in the region. The project is located on an 8.85km (5.5 mile) section of Interstate 435 from Metcalf Avenue to
  • Success of London's Olympic public transport systems
    December 4, 2012
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.