Skip to main content

Bridge demolition causing traffic delays in Los Angeles

The California city of Los Angeles is expected to suffer unprecedented levels of road congestion this weekend. The city has some of the most congested stretches of highway in the US and arguably the world. However the need to demolish a highway bridge will result in a highway closure, including a key interchange that carries extremely heavy traffic volumes. The I-405 San Diego highway will be closed between the San Fernando Valley and the LA Basin.
April 19, 2012 Read time: 1 min
The California city of Los Angeles is expected to suffer unprecedented levels of road congestion this weekend. The city has some of the most congested stretches of highway in the US and arguably the world. However the need to demolish a highway bridge will result in a highway closure, including a key interchange that carries extremely heavy traffic volumes. The I-405 San Diego highway will be closed between the San Fernando Valley and the LA Basin. The stretch shut for the demolition job will be between the busy interchange where I-405 meets the Ventura highway, and will end at interchange where I-405 meets the Santa Monica highway. The interchange where I-405 meets the Ventura highway is reputed to carry the highest volumes of merging traffic of any such interchange in the US. The authorities have been warning residents and commuters for some time over the closure.

Related Content

  • LA can learn from Oakland UBM
    July 15, 2022
    Los Angeles is just embarking on its universal basic mobility journey – but fortunately the city can draw on the findings of a similar programme in Oakland…
  • Feature Test Nt
    July 31, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014.
  • Feature Test Nt
    July 31, 2014
    David Crawford previews a work zone travel breakthrough. In February 2014, the Port of Long Beach in California launched what it claims is a groundbreaking construction zone navigation aid - LB Bridge mobile app. The app is designed to help drivers during the Gerald Desmond Bridge replacement programme by keeping them up to date on activity and the ensuing traffic diversions when construction starts in summer 2014.
  • Wireless bridges widen options for ITS upgrades
    December 9, 2014
    Antaira Technologies’ marketing engineer Brian Roth explains why the increasing capacity of wireless bridges is reducing the cost of expanding and upgrading ITS networks. With more than half of the world’s population now living in cities, the need for efficient transportation of both people and goods has never been greater and that pressure is unlikely to ease any time soon. Indeed in many regions of the world the rate of urbanisation is still increasing as the demand for rural workers continues to decline.