Skip to main content

Bharath Electronics wins $12 million contract to renew Hyderabad’s traffic signalling infrastructure

The city of Hyderabad has announced an ambitious 12-month plan to install a new city-wide traffic signal system called the Hyderabad Traffic Integrated Management System (HTRIMS). The US $12 million contract, which was awarded to Bharath Electronics Limited (BEL) earlier this month, aims to upgrade traffic signals at 180 existing junctions across the busy city and bring a further 41 new junctions into the system.
September 3, 2012 Read time: 2 mins
The city of Hyderabad has announced an ambitious 12-month plan to install a new city-wide traffic signal system called the Hyderabad Traffic Integrated Management System (HTRIMS).

The US $12 million contract, which was awarded to 6501 Bharath Electronics Limited (BEL) earlier this month, aims to upgrade traffic signals at 180 existing junctions across the busy city and bring a further 41 new junctions into the system.

Hyderabad traffic police chief CV Anand says that nearly 50 junctions will have been brought into the new system by September 30 2013 and that HTRIMS will be the first project of its kind in India. The scheme will impose “stringent penalties” if conditions are not met added Anand.

“BEL will be penalised if it misses any deadline. The Service Level Agreement is linked with performance and payments to the company will be cut down if a signal fails to function for an hour during the whole year,” he explained.

To ensure uninterrupted power supply the new signalling system will be fed by three different supply sources: the normal commercial electricity grid, solar panels and an emergency battery backup network. The signalling system will also have features like full connectivity with a centralised command system, virtual loop cameras for adaptive traffic control and automatic signal timing adjustment.

“One of the main problems of the present signals is that they are not properly visible to the motorists,” says the police chief. “The new signals will be put up at prominent places. Even the brightness of the signals will be automatically adjusted by the system.”

According to BEL project manager D. Ravi Kumar, another challenge will be that the “traffic conditions in Hyderabad are different from Bangalore … so we are doing a comprehensive study of the system. We will try to install 50 signals by September 30 2013.”

The project can also be expanded by including more junctions or services, added Kumar. And, for the first time in India, the project is also being monitored by third party independent PMU (Professional Management Unit) provided by a team from the Administrative Staff College of India.

For more information on companies in this article

Related Content

  • London mayor re-elected despite ULEZ expansion opposition
    May 7, 2024
    Sadiq Khan won third term even though opponents said clean air measure was unpopular
  • Developing an integrated WIM/ANPR enforcement system
    July 31, 2012
    The weigh in motion market remains especially buoyant and technological development continues to reflect this. Although there are major differences in operating philosophies, particularly between developed and developing countries, both the numbers of countries using Weigh In Motion (WIM) technology and the numbers of systems that they deploy are on the increase.
  • Indra to upgrade Algeria’s Bouïra tunnel
    September 2, 2015
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • Georgia Tolls contracts awarded
    December 20, 2013
    Georgia Tolls has awarded contracts for their second and third toll express lanes project on I-75 south and I-75/575 northwest. With national interoperability planned they require the toll systems supplier to install multi-protocol readers on the toll gantries to E-ZPass transponders as well as 6C sticker tags. Toll system integrator will be 3M who is to provide the toll system including vehicle detection, tracking and classification loops, 3-protocol RF readers, license plate imaging cameras and illumin