Skip to main content

Automated traffic gates deployed on Auckland infrastructure project

The Victoria Park Tunnel, a significant infrastructure improvement to connect the Auckland harbour bridge to the Central Motorway in Auckland, New Zealand, has deployed a SwiftGate automated lane closure system. At the heart of the infrastructure project is an additional on-ramp built to increase the accessibility of the northbound highway lanes directly from urban downtown streets. This additional access is only available during peak hours when a movable barrier is shifted out, which meant that the ramp en
May 16, 2012 Read time: 2 mins
RSSThe Victoria Park Tunnel, a significant infrastructure improvement to connect the Auckland harbour bridge to the Central Motorway in Auckland, New Zealand, has deployed a SwiftGate automated lane closure system.

At the heart of the infrastructure project is an additional on-ramp built to increase the accessibility of the northbound highway lanes directly from urban downtown streets. This additional access is only available during peak hours when a movable barrier is shifted out, which meant that the ramp entry point needed to be opened and closed on a daily basis. The SwiftGate automated lane closure system now used to facilitate this operation features solar powered automated traffic control gates that can be opened and closed remotely. For the Victoria Park Tunnel Project the SwiftGates needed to be fully integrated into the complex ITS infrastructure that was being implemented during the project. Situated at the busy Beaumont / Fanshawe intersection, the SwiftGates are integrated via the 538 Versilis Commander Interface module to operate in sync with warning signs, traffic lights and indicative panels. The operation of the SwiftGates involves coordination between the movable barrier machine operators and the personnel  at the traffic control centre.

This project is the second permanent SwiftGate installation which includes full integration into an existing or new ITS infrastructure. The first project of this kind was the Jacques-Cartier Bridge, in Montreal, Canada, installation in March 2011 which allowed for the safe operation of the bridge’s reversible lane.

For more information on companies in this article

Related Content

  • ITS needs data highways
    November 18, 2014
    Transport and traffic data is on the increase but there must be an integrated data highway to derive the maximum ITS benefits, argues Deutsche Telekom. From public transport operators recording increasingly precise and comprehensive data on their vehicle’s position and driving behaviour to local authorities using RFID and video systems to control traffic on their streets and highways, the amount of traffic data is growing rapidly.
  • Technology advances improve enforcement
    July 26, 2012
    Across the board, technology is being brought to bear to improve the efficiency of enforcement. Bus lane monitoring, parking and controlled access have all benefited from systems introduced in recent months. While speed and red light infringements tend to attract the most attention, there remain several other areas of enforcement where automation can bring significant operational and efficiency benefits. Lane monitoring and access control also continue to benefit from technological development.
  • TRL to contribute to new autonomous vehicle research programme
    October 23, 2015
    The UK’s Transport Research Laboratory (TRL) the, has announced it is part of a new US$17 million five-year research programme to develop fully autonomous cars. The programme, jointly funded by Jaguar Land Rover and the Engineering and Physical Sciences Research Council (EPSRC), will look at some key technologies and questions that need to be addressed before driverless cars can be allowed on the roads without jeopardising the safety of other road users, including cyclists and pedestrians. TRL is the on
  • Connected citizens boosts Boston’s traffic management
    March 30, 2017
    Data-derived traffic management is starting to show benefits as David Crawford discovers. The city of Boston has been facing growing congestion problems in its Seaport regeneration district, with the rate of commercial and residential growth threatening to overtake the capacity of the road network to respond.