Skip to main content

Arizona chooses consortium for its largest-ever highway project

The Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway. The consortium includes Fluor Enterprises, Granite Construction and Ames Construction, with Parsons Brinckerhoff as the lead designer. The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised
January 4, 2016 Read time: 2 mins
The 6576 Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway.  The consortium includes 2248 Fluor Enterprises, 7973 Granite Construction and Ames Construction, with 4983 Parsons Brinckerhoff as the lead designer.

The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised asphalt and aesthetics designed in partnership with the community.

While the freeway will not be a toll road, the public-private partnership will allow ADOT to construct the project at an accelerated pace and at a lower cost.

This public-private partnership will reduce costs to taxpayers while accelerating construction. Typically, a project of this magnitude would be split into several smaller projects, but the South Mountain Freeway will be completed as a single project by one contracting team and remains on track for construction to begin in summer 2016. ADOT is expected to finalise the contract with Connect 202 Partners by mid-February. Construction is expected to take up to four years to complete.

“While ADOT has successfully built and managed hundreds of miles of freeways in the Phoenix metropolitan area, following a public-private partnership path for the first time was an appropriate tool for the South Mountain Freeway,” ADOT director John Halikowski said. “ADOT will be able to complete this much-needed project sooner as a result, while increasing the likelihood of saving taxpayer dollars.”

“The South Mountain Freeway is a critical piece of the MAG freeway program,” said Scottsdale Mayor Jim Lane, chair of the Maricopa Association of Governments Regional Council. “The freeway has been included in the voter-approved Regional Transportation Plan since 1985 and will provide improved mobility for residents in the MAG region. The design, construction and maintenance of the freeway by a private developer is a unique and innovative approach to delivering this important project.”

For more information on companies in this article

Related Content

  • Active traffic management - challenges and benefits
    April 12, 2013
    Minnesota DoT has built one of the most intensive Active Traffic Management (ATM) systems on the road today. Like many ITS deployments, the state has gained benefits but also faces many challenges, as Pete Goldin reports. Smart Lanes is the brand name of Minnesota Department of Transportation’s (MnDoT) ATM system on I-35W in the Twin Cities Metro Area. The original system covered 16 miles of I-35W south of Minneapolis starting in 2009, and was extended by two miles in 2011. Additional ATM equipment was inst
  • First nationwide traffic information service for Austria
    November 27, 2012
    The vision of Austria’s transport experts of implementing a comprehensive integrated transport network is about to become a reality with Traffic Information Austria (VAO). Launched at the ITS World Congress, VAO is scheduled to go live in late spring 2013, using technology provided by software companies PTV Group and Haco, in partnership with Austrian motorway operator ASFINAG, the Austrian transport association organisers ARGE ÖVV, ITS Vienna Region, ÖAMTC, Ö3 traffic editorial staff, the City of Graz, th
  • New York State Thruway to go all electronic
    February 21, 2013
    The New York State Thruway is converting two mainline and one side toll plaza to all electronic (AET) or cashless toll collection, in a drive to contain spiralling employee costs and debts caused by a reduction in traffic. Although the original plan called for open road tolling (ORT) plus a cash toll plaza, the Request for Proposals for the new bridge allowed bidders to propose AET during the construction if that reduced disruption of traffic. Work is now starting on the new bridge which under the contract
  • Drivewyze wins ITS America innovation award
    May 6, 2024
    Firm's Smart Roadways tech issues in-cab safety alerts to commercial truck drivers