Skip to main content

Arizona chooses consortium for its largest-ever highway project

The Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway. The consortium includes Fluor Enterprises, Granite Construction and Ames Construction, with Parsons Brinckerhoff as the lead designer. The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised
January 4, 2016 Read time: 2 mins
The 6576 Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway.  The consortium includes 2248 Fluor Enterprises, 7973 Granite Construction and Ames Construction, with 4983 Parsons Brinckerhoff as the lead designer.

The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised asphalt and aesthetics designed in partnership with the community.

While the freeway will not be a toll road, the public-private partnership will allow ADOT to construct the project at an accelerated pace and at a lower cost.

This public-private partnership will reduce costs to taxpayers while accelerating construction. Typically, a project of this magnitude would be split into several smaller projects, but the South Mountain Freeway will be completed as a single project by one contracting team and remains on track for construction to begin in summer 2016. ADOT is expected to finalise the contract with Connect 202 Partners by mid-February. Construction is expected to take up to four years to complete.

“While ADOT has successfully built and managed hundreds of miles of freeways in the Phoenix metropolitan area, following a public-private partnership path for the first time was an appropriate tool for the South Mountain Freeway,” ADOT director John Halikowski said. “ADOT will be able to complete this much-needed project sooner as a result, while increasing the likelihood of saving taxpayer dollars.”

“The South Mountain Freeway is a critical piece of the MAG freeway program,” said Scottsdale Mayor Jim Lane, chair of the Maricopa Association of Governments Regional Council. “The freeway has been included in the voter-approved Regional Transportation Plan since 1985 and will provide improved mobility for residents in the MAG region. The design, construction and maintenance of the freeway by a private developer is a unique and innovative approach to delivering this important project.”

Related Content

  • February 12, 2013
    Setting new Horizons for highways maintenance
    Rochdale Metropolitan Borough Council (MBC) is targeting priority highways maintenance schemes with strategic support from Yotta DCL, whose consultants used its web-based Horizons visualised asset management software to create works programmes for the carriageway and footway network across Rochdale’s four townships and their wards. This latest contract builds on previous work done by Yotta DCL, including coarse visual inspections (CVI), scanner surveys, footway network surveys and video asset inventory coll
  • August 29, 2017
    US DOT awards funding for Maryland Purple Line Project
    The US Department of Transportation’s Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties. The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College
  • January 30, 2012
    Toll performance exceeds expectations, improves travel times
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • March 17, 2016
    ‘Free’ power for signs, shelters and so much more
    David Crawford looks at the sunny side of the street. Solar power has been relatively slow in entering the transport sector, but a current blossoming of activity bodes well for the large-scale harnessing of an alternative energy that is zero-emission at source and, in practical terms, infinitely renewable. Traffic management and traveller information systems, and actual vehicles, are all emerging as areas for deployment. Meanwhile roads themselves are being viewed as new-style, fossil fuel-free ‘power stati