Skip to main content

Arizona chooses consortium for its largest-ever highway project

The Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway. The consortium includes Fluor Enterprises, Granite Construction and Ames Construction, with Parsons Brinckerhoff as the lead designer. The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised
January 4, 2016 Read time: 2 mins
The 6576 Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway.  The consortium includes 2248 Fluor Enterprises, 7973 Granite Construction and Ames Construction, with 4983 Parsons Brinckerhoff as the lead designer.

The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised asphalt and aesthetics designed in partnership with the community.

While the freeway will not be a toll road, the public-private partnership will allow ADOT to construct the project at an accelerated pace and at a lower cost.

This public-private partnership will reduce costs to taxpayers while accelerating construction. Typically, a project of this magnitude would be split into several smaller projects, but the South Mountain Freeway will be completed as a single project by one contracting team and remains on track for construction to begin in summer 2016. ADOT is expected to finalise the contract with Connect 202 Partners by mid-February. Construction is expected to take up to four years to complete.

“While ADOT has successfully built and managed hundreds of miles of freeways in the Phoenix metropolitan area, following a public-private partnership path for the first time was an appropriate tool for the South Mountain Freeway,” ADOT director John Halikowski said. “ADOT will be able to complete this much-needed project sooner as a result, while increasing the likelihood of saving taxpayer dollars.”

“The South Mountain Freeway is a critical piece of the MAG freeway program,” said Scottsdale Mayor Jim Lane, chair of the Maricopa Association of Governments Regional Council. “The freeway has been included in the voter-approved Regional Transportation Plan since 1985 and will provide improved mobility for residents in the MAG region. The design, construction and maintenance of the freeway by a private developer is a unique and innovative approach to delivering this important project.”
UTC

Related Content

  • July 28, 2014
    I-69 Section 5 to go ahead
    The Indiana Finance Authority (IFA) and I-69 Development Partners reached financial close on section 5 of I-69 Section 5 from Bloomington to Martinsville. The 142-mile I-69 corridor is divided into six sections. The first three sections opened for business in November 2012 and construction is underway on all 27 miles of I-69 Section 4 between Crane and Bloomington. I-69 Section 5 involves repairing and upgrading 21 miles of the existing, four-lane State Road 37 to interstate standards. I-69 Developmen
  • July 1, 2016
    WSP/Parsons Brinckerhoff deploys connected vehicle technology for US army test
    As part of the Planet M initiative, the US Army Tank Automotive Research Development and Engineering Center (TARDEC) and the Michigan Department of Transportation (MDOT) have partnered to test connected vehicle applications on the I-69 freeway in Lapeer County, Michigan. WSP/Parsons Brinckerhoff is part of the MDOT team leading the infrastructure deployments. The test involved the installation of six road side units (RSU) at different locations to create a vehicle communications system. The system evalu
  • July 7, 2015
    Strabag consortium wins Colombia highway concession
    ANI, Colombia’s national infrastructure agency, has awarded the SAC 4G consortium a US$898 million contract to design, build, finance and operate the 176 km Autopista al Mar 1 motorway over 25 years. The consortium comprises Austrian construction group Strabag, Spain’s Sacyr and Concay of Colombia. The project, in the Department of Antioquia in north-western Colombia and will link Medellín, the capital of Antioquia, with the cities of San Jerónimo and Santa Fe de Antioquia before continuing to Bolombo
  • June 2, 2016
    Michigan DOT awards WSP/Parsons Brinckerhoff CV contracts
    The Michigan Department of Transportation (MDOT) has awarded two contracts to WSP/ Parsons Brinckerhoff for the development of connected vehicle initiatives throughout the state. The company will act as on-call consultant for MDOT’s state-wide connected vehicle program for a period of three years, providing such services as planning and strategy development, design and deployment of foundational system elements, public outreach and progress reporting and development of industry partnerships. In additi