Skip to main content

Arizona chooses consortium for its largest-ever highway project

The Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway. The consortium includes Fluor Enterprises, Granite Construction and Ames Construction, with Parsons Brinckerhoff as the lead designer. The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised
January 4, 2016 Read time: 2 mins
The 6576 Arizona Department of Transportation (ADOT) has selected Connect 202 Partners as the preferred developer for its first highway public-private partnership, the Loop 202 South Mountain Freeway.  The consortium includes 2248 Fluor Enterprises, 7973 Granite Construction and Ames Construction, with 4983 Parsons Brinckerhoff as the lead designer.

The South Mountain Freeway will be constructed with four lanes in each direction - three general-use lanes and one HOV lane - and includes modern features including rubberised asphalt and aesthetics designed in partnership with the community.

While the freeway will not be a toll road, the public-private partnership will allow ADOT to construct the project at an accelerated pace and at a lower cost.

This public-private partnership will reduce costs to taxpayers while accelerating construction. Typically, a project of this magnitude would be split into several smaller projects, but the South Mountain Freeway will be completed as a single project by one contracting team and remains on track for construction to begin in summer 2016. ADOT is expected to finalise the contract with Connect 202 Partners by mid-February. Construction is expected to take up to four years to complete.

“While ADOT has successfully built and managed hundreds of miles of freeways in the Phoenix metropolitan area, following a public-private partnership path for the first time was an appropriate tool for the South Mountain Freeway,” ADOT director John Halikowski said. “ADOT will be able to complete this much-needed project sooner as a result, while increasing the likelihood of saving taxpayer dollars.”

“The South Mountain Freeway is a critical piece of the MAG freeway program,” said Scottsdale Mayor Jim Lane, chair of the Maricopa Association of Governments Regional Council. “The freeway has been included in the voter-approved Regional Transportation Plan since 1985 and will provide improved mobility for residents in the MAG region. The design, construction and maintenance of the freeway by a private developer is a unique and innovative approach to delivering this important project.”

For more information on companies in this article

Related Content

  • Figures show Express Lanes bring wider benefits
    August 12, 2015
    Drivers in the Washington DC area are realising time savings following the opening of Express Lanes on the I-95 - and not only those paying to use the new facility. Washington is ranked as being the worst gridlocked city in the United States. Every day its drivers face an average commute time of 39.5 minutes and they waste an average of 67 hours every year just sitting in traffic. In a move to counter these problems, late last December new Express Lanes were opened along 46.6km (29 miles) of the I-95 betwee
  • SCATS study shows significant savings
    December 16, 2013
    Australian study quantifies the benefits of SCATS to the motorists, the environment and the economy. Opportunity weekday cost savings potential of some AUD16 million (US$15.2 million) has emerged from rigorous analysis of a one-day study of Australia’s Sydney Coordinated Adaptive Traffic System (SCATS) in operation. This represents 27% of the total cost of a real alternative semi-adaptive traffic control. The estimated indicative annual weekday-based value is AUD3,900 million (US$3,705 million) or 0.9% of t
  • Project to ease traffic on Interstate 80 unveiled
    October 29, 2012
    California’s regional transportation officials are taking a comprehensive approach to relieving clogged arteries that affect the health of commuters and cities along a 22-mile stretch of the Interstate 80 corridor from the Carquinez Bridge to the MacArthur Maze.
  • Watch your step: the sidewalk robots are here
    March 14, 2023
    The way we order and pay for goods has changed radically – but what about how those goods are delivered? Gordon Feller looks at how sidewalk robots might reshape the urban landscape