Skip to main content

AMG transmission system used in Blackwall Tunnel refurbishment

AMG Systems has announced it has been selected to supply the transmission solution for the refurbished Victorian-built Blackwall Tunnel under the river Thames in London. The three-year refurbishment programme, costing over US$113 million, is being undertaken by Transport for London (TfL) to bring the tunnel up to European safety regulations. P. Ducker Systems (PDS) is undertaking the task of supplying the tunnel systems for the project.
May 18, 2012 Read time: 2 mins
558 AMG Systems has announced it has been selected to supply the transmission solution for the refurbished Victorian-built Blackwall Tunnel under the river Thames in London. The three-year refurbishment programme, costing over US$113 million, is being undertaken by 1466 Transport for London (TfL) to bring the tunnel up to European safety regulations. P. Ducker Systems (530 PDS) is undertaking the task of supplying the tunnel systems for the project.

As Mike Rose, business development manager at PDS points out, the Blackwall Tunnel was originally built to transport horse-drawn carriages under the river Thames, but today more than 50,000 vehicles use the tunnel every day.

“There are two tunnel bores – each, carrying traffic in two lanes. The northbound tunnel, which we’re currently working on, is 1.4 km long. The new tunnel systems cover new fire and incident detection and a new CCTV camera system. The transmission solution will be supplied by AMG Systems. We will be implementing the AMG 5000 series for transmission of video and associated data and alarms over singlemode fibre. The solution covers 64 cameras mounted throughout the tunnel bore,” Rose said.

In order to minimise disruption to the road users during the refurbishment programme, the tunnel is closed each evening at 9.00pm until 5.00am when all the work is conducted. Work is currently ahead of schedule and TfL is expecting that the work will be completed before the end of 2011, a year ahead of schedule.

For more information on companies in this article

Related Content

  • The great pay divide
    April 2, 2014
    Public acceptance is crucial for the acceptance of managed and express lanes as Jon Masters discovers. Lists of proposed highway expansion projects introducing variably priced toll lanes continue to lengthen. Managed lanes, or express lanes to some, are gaining support as a politically favourable way of adding capacity and reducing acute congestion on principal highways. In Florida, for example, the managed lanes on the 95 Express are claimed to have significantly increased average peak-time speeds on tolle
  • How on-board video systems can increase vehicle & road safety
    January 7, 2022
    Hikvision examines technology which can avert danger in cars, school buses, taxis and trucks
  • Australia's ground breaking average speed enforcement
    February 1, 2012
    The speed enforcement system on the Hume Highway in Australia combines both spot and point-to-point solutions. Here, Redflex's Peter Whyte discusses its implementation. The Australian State of Victoria has achieved notable success in reducing casualty rates since launching a three-pronged road accident prevention initiative in the late-1980s.
  • Virtual surveying boosts efficiency in Utah DOT
    June 12, 2015
    Overlaying a geographic information system with data from a new surveying system is paying dividends for Utah DOT. While building new roads tramways, metros and bicycle paths or installing smart systems to control traffic is the high-profile end of transportation planning and management, ensuring existing infrastructure and systems are serviceable and working is arguably more important. After all, at any given point the existing infrastructure will always carry more vehicles than new.