Skip to main content

AECOM secures third Menai Crossing contract

Infrastructure services firm AECOM has secured a contract with the Welsh Government to deliver design services for the new third crossing of the Menai Strait. Under the contract, AECOM will undertake the Key Stage 2 Appraisal of options to identify and develop initial designs for a new bridge crossing that will link Anglesey with mainland Wales, with a view to identifying a preferred route. The new Menai crossing is intended to alleviate traffic on the two existing bridges over the Menai Strait. The Menai B
April 27, 2017 Read time: 2 mins
Infrastructure services firm 3525 AECOM has secured a contract with the Welsh Government to deliver design services for the new third crossing of the Menai Strait. Under the contract, AECOM will undertake the Key Stage 2 Appraisal of options to identify and develop initial designs for a new bridge crossing that will link Anglesey with mainland Wales, with a view to identifying a preferred route.


The new Menai crossing is intended to alleviate traffic on the two existing bridges over the Menai Strait. The Menai Bridge, built by Thomas Telford in the 1820s and Robert Stephenson's Britannia Bridge suffer from heavy congestion. The Britannia Bridge is also the only section of the A55 that is not dual carriageway and can be a significant bottleneck for traffic along the route, which links the M53 with Holyhead Port and is part of the Trans European Road network.

The aim of the scheme is to improve capacity, reliability and journey times along the route, as well as improve network resilience and opportunities for non-motorised users and safety.

AECOM will deliver a range of services, including bridge and highway engineering, transport planning, traffic modelling and environmental and ecology consultancy services. It will also carry out a review of the potential impact of the proposed scheme on the two historic bridges to develop a design that minimises impact on the environment and is sympathetic to the existing crossings. AECOM will work with its sub-consultants Knight Architects and Ruthin-based environmental consultancy Richards, Moorehead & Laing.

For more information on companies in this article

Related Content

  • Reversible express lanes and open road tolling combat congestion
    March 2, 2012
    Teri England, Diamond Consulting Services, details the construction of construction of a world first - reversible express lanes with cashless multi-lane ORT - on the Tampa Hillsborough Expressway
  • UK digital Railway contracts awarded
    June 21, 2016
    WSP/Parsons Brinckerhoff has been appointed by the UK’s Network Rail to provide design and engineering services on the Digital Railway’s Multi-Functional Design Framework (MFD). The digital railway is a government supported, industry-wide programme aimed at increasing the role of digital technologies to improve capacity, connectivity and reliability. Through the framework WSP/Parsons Brinckerhoff will provide a range of strategic engineering and project management services to support the delivery of the
  • Aimsun updates Next modelling software 
    September 17, 2021
    Aimsun continues to tweak models for bikes with new and reactive instructions
  • Russia 2018 World Cup: ITS can win it
    June 5, 2018
    Teams and supporters will cover vast distances in Russia for the 2018 FIFA World Cup. Stephane Clauss from Sony Europe’s Image Sensing Solutions division examines how the latest camera technologies can be deployed to help things run smoothly over the next month or so... For one month, from June 14, Russia is hosting the 2018 FIFA World Cup. This is the largest country in the world and the distances between venues will be larger than at almost any other World Cup - bar the finals in the US and Brazil.