Skip to main content

AECOM secures third Menai Crossing contract

Infrastructure services firm AECOM has secured a contract with the Welsh Government to deliver design services for the new third crossing of the Menai Strait. Under the contract, AECOM will undertake the Key Stage 2 Appraisal of options to identify and develop initial designs for a new bridge crossing that will link Anglesey with mainland Wales, with a view to identifying a preferred route. The new Menai crossing is intended to alleviate traffic on the two existing bridges over the Menai Strait. The Menai B
April 27, 2017 Read time: 2 mins
Infrastructure services firm 3525 AECOM has secured a contract with the Welsh Government to deliver design services for the new third crossing of the Menai Strait. Under the contract, AECOM will undertake the Key Stage 2 Appraisal of options to identify and develop initial designs for a new bridge crossing that will link Anglesey with mainland Wales, with a view to identifying a preferred route.


The new Menai crossing is intended to alleviate traffic on the two existing bridges over the Menai Strait. The Menai Bridge, built by Thomas Telford in the 1820s and Robert Stephenson's Britannia Bridge suffer from heavy congestion. The Britannia Bridge is also the only section of the A55 that is not dual carriageway and can be a significant bottleneck for traffic along the route, which links the M53 with Holyhead Port and is part of the Trans European Road network.

The aim of the scheme is to improve capacity, reliability and journey times along the route, as well as improve network resilience and opportunities for non-motorised users and safety.

AECOM will deliver a range of services, including bridge and highway engineering, transport planning, traffic modelling and environmental and ecology consultancy services. It will also carry out a review of the potential impact of the proposed scheme on the two historic bridges to develop a design that minimises impact on the environment and is sympathetic to the existing crossings. AECOM will work with its sub-consultants Knight Architects and Ruthin-based environmental consultancy Richards, Moorehead & Laing.

For more information on companies in this article

Related Content

  • South west’s first smart motorway opens
    January 15, 2014
    The first smart motorway scheme in the UK’s south west has been officially launched, covering seven miles of motorway around the Almondsbury interchange and including junctions 19-20 on the M4 and junctions 15-17 on the M5. It is designed to help reduce congestion and improve safety and journey times by introducing variable speed limits and opening the hard shoulder during busy traffic periods. The improvements to the M4 and M5 use a range of technologies and operational systems to reduce congestion and
  • Metron consortium wins Sydney Metro design contract
    May 3, 2017
    Metron, a consortium of Arcadis, Mott MacDonald, architecture house Foster + Partners, local architect Architectus and Robert Bird Group, has been awarded the underground station design and technical services contract as part of Stage 2 of the Sydney Metro project. With 31 stations and 66km of new metro rail, Sydney Metro is Australia's biggest public transport project. Stage 2 will include a 30 kilometre extension of metro rail under Sydney Harbour and through new CBD stations. Metron will lead the enginee
  • Smoothing out city freight movements
    May 28, 2014
    David Crawford welcomes a national first. Urban freight movements, while commercially and socially vital, are a growing logistical headache for planners and people alike. Figures from France’s Lyon Laboratory of Transport Economics indicate that goods transport in major urban areas accounts for: 20% of traffic; 35% of CO2 emissions made by all urban trips; and 50% of the diesel used; while final km delivery runs account for 20% of the total cost of the transport chain.
  • Temporary CCTV poses more challenges than permanent installations
    June 12, 2015
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.