Skip to main content

AECOM secures third Menai Crossing contract

Infrastructure services firm AECOM has secured a contract with the Welsh Government to deliver design services for the new third crossing of the Menai Strait. Under the contract, AECOM will undertake the Key Stage 2 Appraisal of options to identify and develop initial designs for a new bridge crossing that will link Anglesey with mainland Wales, with a view to identifying a preferred route. The new Menai crossing is intended to alleviate traffic on the two existing bridges over the Menai Strait. The Menai B
April 27, 2017 Read time: 2 mins
Infrastructure services firm 3525 AECOM has secured a contract with the Welsh Government to deliver design services for the new third crossing of the Menai Strait. Under the contract, AECOM will undertake the Key Stage 2 Appraisal of options to identify and develop initial designs for a new bridge crossing that will link Anglesey with mainland Wales, with a view to identifying a preferred route.


The new Menai crossing is intended to alleviate traffic on the two existing bridges over the Menai Strait. The Menai Bridge, built by Thomas Telford in the 1820s and Robert Stephenson's Britannia Bridge suffer from heavy congestion. The Britannia Bridge is also the only section of the A55 that is not dual carriageway and can be a significant bottleneck for traffic along the route, which links the M53 with Holyhead Port and is part of the Trans European Road network.

The aim of the scheme is to improve capacity, reliability and journey times along the route, as well as improve network resilience and opportunities for non-motorised users and safety.

AECOM will deliver a range of services, including bridge and highway engineering, transport planning, traffic modelling and environmental and ecology consultancy services. It will also carry out a review of the potential impact of the proposed scheme on the two historic bridges to develop a design that minimises impact on the environment and is sympathetic to the existing crossings. AECOM will work with its sub-consultants Knight Architects and Ruthin-based environmental consultancy Richards, Moorehead & Laing.

For more information on companies in this article

Related Content

  • ITS Australia: cooperative ITS closer to reality
    March 7, 2014
    ITS Australia welcomes recent Australian policy and international standards announcements that pave the way to making connected vehicles a reality and expanding opportunities for Australian innovation. Another important international step toward wireless connectivity for vehicles was the 12 February announcement of technical standards by the European Telecoms Standards Institute (ETSI) and the European Committee for Standardisation (CEN). These standards ensure that vehicles made by different European ma
  • “It's vital to encourage more newcomers into ITS from a broad range of backgrounds”
    November 27, 2023
    The intelligent transportation industry has a need for young people and the structured learning and practical experience of apprenticeships might help attract them, thinks Alistair Gollop, founder of ITS Now
  • Traffic signal priority initiatives aid better bus travel
    March 15, 2012
    David Crawford investigates traffic signal priority initiatives developing for better bus travel on the US Pacific Coast Transit patronage rises by an average of 35% along commuter corridors equipped with bus rapid transit (BRT) systems, according to the US Department of Transportation’s Federal Transit Administration (FTA). BRT as defined as bus transit enhanced with ITS systems for better services, is winning new passengers attracted by opportunity to avoid increasing fuel costs and traffic congestion.
  • FTA supports A9 HGV speed limit trial
    October 10, 2014
    The Freight Transport Association (FTA) has given its support to the HGV speed limit trial which commences on the A9 in Scotland on Tuesday 28 October. The pilot project on the A9 will raise the speed limit on the single carriageway sections between Perth and Inverness from 40 to 50mph for heavy goods vehicles which have a laden weight exceeding 7.5 tonnes. The trial, which will last 36 months and is to be introduced at the same time as a new average speed camera system, is aimed at improving the opera