Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

Related Content

  • AECOM and PB JV for Los Angeles regional connector
    April 23, 2012
    The Los Angeles County Metropolitan Transportation Authority (LACMTA) has selected a joint venture of AECOM and Parsons Brinckerhoff (PB) to provide conceptual planning and preliminary design for the US$1.4 billion Metro Regional Connector Transit corridor project, also known as the Downtown Connector or Downtown Light-Rail Connector.
  • Nothing smart about ‘deadly’ lay-bys on all-lane running motorways, says AA
    September 27, 2016
    Eight out of 10 UK drivers think that removal of hard-shoulders on smart motorways has made motorways more dangerous than four years ago, according to an AA-Populus poll of 20,845 drivers. Some drivers even refer to the lay-bys on these motorways as ‘death zones’.
  • Highways England showcases progress on high tech corridor project
    October 12, 2018
    Highways England is leading a project to establish a high tech corridor on the A2/M2 in Kent which will allow specially-equipped vehicles to interact with roadside infrastructure. As part of the initiative, Highways England hosted a week-long Testfest event in Chatham, Kent, this week, showing how test vehicles receive information on road conditions, road works and the time left for traffic lights to change to green via a wireless network. Jo White, head of Highways England’s intelligent transport system
  • EU releases first transport infrastructure funds
    April 8, 2014
    Following its decision in March to make the first US$16.4 billion tranche of funding available for trans-European transport network projects, the European commission has now adopted the first work programmes within this framework: a multi-annual work programme covering larger projects with a total budget of US$15.1 billion and an annual work programme for 2014 addressing smaller projects with a budget of US1.3 billion. The funding priorities set out in these programmes include: The closing of missing lin