Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.
UTC

Related Content

  • August 20, 2015
    European tunnel upgrades following new safety legislation
    Across Europe there is a very mixed picture of compliance to latest safety standards for road tunnels. Best practice has emerged, however, in the wake of European legislation. Jon Masters reports High profile fatal fires following accidents in the Mont Blanc, Tauern and Gotthard tunnels prompted the 2004 European Union Directive 2004/54 on road tunnel safety. This meant all EU member states would have to meet new standards of safety in road tunnels by 30 April 2014. The Directive applied to all tunnels over
  • December 11, 2015
    Tachometer breaks cause nearly 1,700 road closures, says IAM
    Tachometer breaks, the mandatory rest stops commercial operators must take when driving, were the cause of nearly 1,700 road closures in one year alone, according to newly released figures from IAM Drive & Survive. According to the Road Haulage Association, 85 per cent of everything sold in the UK is carried by truck at some stage of the supply chain, with this number set to increase as more retail purchases are made online in the run up to Christmas. The numbers come from a Freedom of Information re
  • November 11, 2024
    ITS UK Awards 2024: and the winners are...

    ITS UK revealed the winners of its prestigious annual Awards at its 18th President’s Dinner last week.

    Organisation president and former UK transport minister Steve Norris presented the trophies across 16 categories.

    "Many congratulations to all the winners of the ITS UK Annual Awards," said Max Sugarman, chief executive of ITS UK.

  • March 2, 2012
    Reversible express lanes and open road tolling combat congestion
    Teri England, Diamond Consulting Services, details the construction of construction of a world first - reversible express lanes with cashless multi-lane ORT - on the Tampa Hillsborough Expressway