Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.
UTC

Related Content

  • July 7, 2014
    Redflex installs the first point to point system in South Australia
    Following the successful rollout of average speed enforcement systems on four zones of Victoria’s Peninsula Link and up to eight zones of the Hume Highway, together with 37 sites in New South Wales, Redflex has now implemented next generation average speed enforcement systems on Port Wakefield Road and Dukes Highway in South Australia. Two RedflexPoint-to-point cameras are now providing average speed enforcement on two major carriageways leading into the city of Adelaide; in both directions on the 13 kil
  • November 13, 2014
    Colombian highway sees ITS tested to the extreme
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.
  • February 20, 2018
    UK lane rental schemes set to go nationwide to help reduce congestion
    UK lane rental schemes, where utility companies can be charged up to £2,500 ($3,499) each day for digging up the busiest roads at peak times, can be adopted by councils as part of a government approved strategy to help reduce congestion. The announcement follows successful trials conducted in London and Kent. This scheme aims to incentivise firms to work on quieter roads or outside of rush hour as well as collaborate with other companies to prevent roads from being dug up multiple times. Around 2.5 mi
  • January 29, 2015
    Highways Agency chief executive to step down
    The Chief Executive of the Highways Agency (HA), Graham Dalton, announced today that he is leaving his post in the summer. During his seven years in post Graham has led the agency through a time of financial constraint and of growing ambition for the strategic road network. He has led the agency as it has established a strong reputation for efficiency, for delivering capital investment, and for operating one of the most intensively used road networks in Europe. Graham Dalton said: “It has been a priv