Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • New South Wales budget ‘builds for the future’
    June 22, 2017
    Australia’s New South Wales Government has committed US$55 billion (A$72.7 billion) over the next four years to infrastructure investments, including US$31 billion (A$41.4 billion) for roads and transport.
  • Car to car communications a step closer
    December 14, 2012
    Vehicle manufacturers have targeted 2015 for the first cars to roll off European assembly lines fitted with operational V2X technology. They and their partners in the Car 2 Car Communications Consortium are confident of meeting the target, reports Jon Masters. Around three years from now vehicles should be appearing in showrooms boasting the capability of communicating with each other. Manufacturers will have started fitting the first proprietary car-to-car driver-aid safety devices and deployment of ‘vehic
  • Frazer-Nash adds its expertise to CHARM project
    July 6, 2016
    Frazer-Nash, the systems and engineering technology company, has been appointed by Highways England to support the Common Highways Agency Rijkswaterstaat Model (CHARM) advanced traffic management system (ATMS) programme. CHARM is a collaboration between Highways England and the Dutch Rijkswaterstaat to develop an integrated ATMS for the UK and Dutch highways. Frazer-Nash will apply its expertise in safety critical transport and emergency service control rooms, and its behavioural science knowledge to
  • Compass4D second meeting examines Danish ITS bus project
    April 26, 2013
    Following its successful first meeting in Spain earlier this year, the Compass4D consortium met for the second time in Copenhagen to plan forthcoming work and to participate in a joint workshop with ITS Denmark on ITS deployment best practices. The Copenhagen pilot site is important to the project as the city will deploy cooperative systems on at least ninety buses and at twenty-one traffic signals. The route chosen for the pilot site is a central bus route running between Copenhagen Central Station and the