Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • New project to develop one-stop-shop mobility services for Europe
    October 27, 2015
    Finland’s Technical Research Centre is coordinating a pan-European mobility as a service (MaaS) project aimed at creating the prerequisites for organising user-oriented and ecological mobility services. The goal is to provide consumers with flexible, efficient and user-friendly mobility services covering multiple modes of transport on a one-stop-shop principle. The two-year MAASiFiE (Mobility as a Service for Linking Europe) project, in addition to mobility services, is investigating opportunities offere
  • Aecom to create new Sharjah transport master plan
    October 9, 2013
    Aecom is to begin a 22-month plan to develop an integrated, multimodal transport plan for Sharjah, which will lead to the development of a new transport strategy and suggested schemes for implementation until 2030. The company has landed a US$4m contract from the Sharjah Directorate of Public Works and Sharjah Transport to create a new Sharjah transport master plan, aimed at slowing the growth of car traffic both through and within Sharjah as well as fostering a shift towards a greater use of public and
  • Autumn budget: EV charging infrastructure fund and higher tax rates for diesel vehicles
    November 23, 2017
    Chancellor of the Exchequer Philip Hammond has announced a £400m ($532m) charging infrastructure fund for electric vehicles (EVs), an extra £100m ($133m) investment in Plug-In-Car Grant, and a £40m ($53m) in charging R&D in the UK’s Autumn Budget 2017. He added that laws need to be clarified so that motorists who charge their EVs at work will not face a benefit-in-kind charge from next year.
  • IAM shocked by the worst speeders in England and Wales
    February 12, 2015
    The UK’s Institute of Advanced Motorists (IAM) has lifted the lid on the worst examples of excessive speeding caught on safety cameras across England and Wales in 2014. Britain’s two worst speeders were caught at 146mph, both by Kent Police on the M25, one travelling anti-clockwise, the other going clockwise. There were three other recorded instances of speeds of 140mph or more; 145mph on the M6 toll road (70mph limit), 141mph on the A1 Great Ponton Northbound road (70mph limit) and 140mph on the A5 C