Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • Progress of ICT transport research projects
    February 3, 2012
    Juhani Jääskeläinen, head of the ICT for Transport Unit, DG Information Society and Media, European Commission, details the results of Call 4 for research projects in ICT for transport. Since the closure of the call and evaluation process during the summer of last year the European Commission (EC) has been negotiating and signing contracts with projects which were selected from proposals submitted to Call 4 of the 7th Framework Programme (FP7) in the area of Information and Communication Technology (ICT) fo
  • UK motorway gets first ‘orange’ smart motorway emergency area
    July 17, 2017
    The first new-style smart motorway emergency area, where drivers can stop in an emergency, is being trialled on the M3 motorway in Surrey. Highways England is trialling the redesigned emergency area in response to public concern about smart motorways. It has a highly visible orange road surface and better signs to help improve its visibility make it more obvious to drivers on smart motorways. It is also hoped that it will encourage drivers to only use them in emergency situations. The first of the new emerg
  • Car traffic in London is down but congestion is up, says new study
    May 18, 2016
    London Congestion Trends, an in-depth study of the causes of traffic congestion in London between 2012 and 2015 published by Inrix, indicates that congestion in London is increasing, with journey times in Central London growing by 12 per cent annually. Inrix says this is consistent with data that shows that the London economy and population are growing, which normally results in an increase in gridlock. Further, unemployment and fuel prices are down, both of which usually mean a rise in traffic. Despite thi
  • UK begins work on 300km C/AV trial route
    May 19, 2020
    New venture is major addition to CAM Testbed UK