Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • Congestion charging in New York edges a wheel-length closer
    May 16, 2023
    'This is about more than reducing traffic' says city mayor, pledging transit investment
  • EU aims to turn ITS theory into practice
    May 18, 2016
    Gareth Horton explains how the European Commission’s Transport Research and Innovation Portal can help expedite research and turn theory into practice. Over the next few years Europe’s transport systems face a number of challenges, such as improving urban mobility while at the same time protecting population health and accommodating the accessibility needs of an ageing but active population.
  • Indra wins big in Mexico
    December 20, 2013
    Spanish technology multinational Indra has been awarded four new contracts worth US$17 million for its traffic control and toll technology in Mexico. The technology will be implemented on the Paquete Michoacán motorways, the Poetas fast lane, the Celaya ring road motorway and the Necaxa Tihuatlan tunnels. Intelligent traffic systems (ITS) and toll systems will be deployed on the Celaya ring road motorway, including a control centre to integrate the various ITS and surveillance sub-systems via closed circ
  • Continued impact of TEN-T programme
    November 29, 2012
    The Trans-European Transport Network Executive Agency (TEN-T EA) launched for the second year running a campaign aimed at showcasing successfully implemented TEN-T projects. The “ten (more) out of TEN” campaign highlights ten additional TEN-T projects whose successful implementation has yielded regional, national and European added value and which are helping to complete the TEN-T network.