Skip to main content

AECOM appointed technical partner for A303 improvements scheme

Global infrastructure services firm AECOM has secured an eight-year contract with Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme. AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safet
April 12, 2017 Read time: 2 mins
Global infrastructure services firm 3525 AECOM has secured an eight-year contract with 8101 Highways England to work as its technical partner for the major A303 Amesbury to Berwick Down improvements scheme.

AECOM, working with its supply chain partners Mace and Mouchel, will deliver a range of multidisciplinary services to support all phases of the project, which will upgrade the eight-mile stretch of the A303 from single to dual carriageway to create a high-quality, reliable route to the south west, improve safety and help conserve and enhance the Stonehenge World Heritage site (WHS).

The project includes a proposed new tunnel alongside the site to improve the setting of Stonehenge and other important monuments within the WHS, as well as improvements to existing junctions between the A303 and the intersecting A345 and A360.

As technical partner, AECOM will support Highways England in the delivery of the project, providing highways and tunnelling design services, as well as environmental, heritage, noise, traffic modelling and procurement consultancy services.

The scheme is part of a wider strategy to create a new South West Expressway, which includes a package of improvements to the A303 that will support economic growth, generate employment and increase visitor expenditure.

The A303 forms the most direct route between London and the south west and is vital for the local and regional economy. With around 24,000 vehicles using the 35-mile single carriageway section of the road every day, bottlenecks, changes in speed limit, hidden accesses and staggered junctions make journey times unreliable. The accident rate on the A303 is also higher than on other similar roads. Upgrading the road to dual carriageway with motorway standard junctions will help improve journey times and safety, particularly in summer when the number of vehicles using the route increases significantly.

For more information on companies in this article

Related Content

  • Nationwide drive to promote UK cycling
    August 12, 2013
    UK Prime Minister David Cameron has announced a US$119 million injection of cash for the country, along with plans to make roads safer for those on two wheels. US$119 million will be divided between Manchester, Leeds, Birmingham, Newcastle, Bristol, Cambridge, Oxford and Norwich, while the New Forest, Peak District, South Downs and Dartmoor will each share a slice of US$26 million funding for national parks. With local contributions, the total new funding for cycling is US£229 million between now and 2015.
  • UK ‘pauses’ smart motorway roll-out
    January 12, 2022
    All-lane running motorway schemes to be halted until five years' safety data is available
  • Setting new Horizons for highways maintenance
    February 12, 2013
    Rochdale Metropolitan Borough Council (MBC) is targeting priority highways maintenance schemes with strategic support from Yotta DCL, whose consultants used its web-based Horizons visualised asset management software to create works programmes for the carriageway and footway network across Rochdale’s four townships and their wards. This latest contract builds on previous work done by Yotta DCL, including coarse visual inspections (CVI), scanner surveys, footway network surveys and video asset inventory coll
  • FTA supports A9 HGV speed limit trial
    October 10, 2014
    The Freight Transport Association (FTA) has given its support to the HGV speed limit trial which commences on the A9 in Scotland on Tuesday 28 October. The pilot project on the A9 will raise the speed limit on the single carriageway sections between Perth and Inverness from 40 to 50mph for heavy goods vehicles which have a laden weight exceeding 7.5 tonnes. The trial, which will last 36 months and is to be introduced at the same time as a new average speed camera system, is aimed at improving the opera