Skip to main content

Port authority to replace ITS system at George Washington bridge

The Intelligent Transportation System (ITS) at the George Washington Bridge (GWB), first installed in 1997, is to be replaced by the Port Authority of New York and New Jersey as part of a road improvements being planned throughout the region. The ITS provides information on traffic conditions, estimated travel times, and lane restrictions to motorists via electronic signs on roads leading to the GWB. An estimated 101 million vehicles crossed the world’s busiest crossing in both directions in 2011. Work on t
November 16, 2012 Read time: 3 mins
The Intelligent Transportation System (ITS) at the George Washington Bridge (GWB), first installed in 1997, is to be replaced by the 1698 Port Authority of New York and New Jersey as part of a road improvements being planned throughout the region.

The ITS provides information on traffic conditions, estimated travel times, and lane restrictions to motorists via electronic signs on roads leading to the GWB. An estimated 101 million vehicles crossed the world’s busiest crossing in both directions in 2011.

Work on the early-action item of replacing the eight electronic ITS signs on the New York and New Jersey approaches to the George Washington Bridge is expected to commence by the end of 2012 and be complete by the end of 2013. The entire ITS is scheduled to be replaced in approximately four years.

Message signs are located on state highways on both sides of the bridge, so the Port Authority is working closely with the New York State and New Jersey Departments of Transportation on the project.

The ITS will help reduce congestion by informing motorists of traffic conditions in advance so they can plan accordingly. Reduced congestion helps speed motorist travel times, while also benefiting the environment by cutting emissions.

“Replacing the existing ITS at the George Washington Bridge is consistent with one of the Port Authority’s main priorities, which is to keep people and goods moving throughout our region,” said Port Authority Chairman David Samson. “The world’s busiest bridge crossing and the motorists who use it will benefit greatly from a new, upgraded ITS as our region prepares to host the 2014 Super Bowl.”

“By providing motorists real time traffic information about the George Washington Bridge, the new ITS will allow them to plan accordingly,” said Port Authority Executive Director Pat Foye. “It will assist the people who live and work in the region for years to come by reducing delays and emissions from traffic backups.”

“Our decision to replace the ITS is part of the Port Authority’s ongoing effort to deliver solutions for the people of our region,” said Port Authority Deputy Executive Director Bill Baroni. “The Super Bowl is one of the premiere sporting events in the world and it will attract visitors who will help boost our local economies. The new ITS will ensure we are ready for them.”

For more information on companies in this article

Related Content

  • Moveble barriers improve workzone safety, reduce costs
    January 25, 2012
    Two phases of an arterial reconstruction project in Salt Lake City have provided a compelling cost-based argument for moveable barriers.
  • Bespoke ITS is helping to reduced collisions on America’s rural roads
    October 22, 2014
    David Crawford cherrypicks conference and award highlights Almost 30% of all US citizens live in rural areas or very small communities, and 34 of the 50 states exceed this level in their own populations, with the proportions rising as high as 85%. And although rural routes carry only 35% of all traffic, the accidents that occur on them account for some 54% of all US road traffic accident deaths.
  • Comprehensive communications combats tolling resistance
    May 19, 2017
    Toll road operator must provide clear, comprehensive and consistent communications to user groups and the local community long before the facility opens. When new tolled highway infrastructure is about to go into service, the construction, management and finance specialists who brought it into being are about ready for a well-deserved celebration. But for the communications and outreach team responsible for building public support for the project – for bringing drivers to the road, and keeping partners and
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.