Skip to main content

LA microgrid to charge 100 e-buses

Project is expected to reduce emissions and lower LADoT’s electricity costs 
By Ben Spencer November 22, 2021 Read time: 2 mins
LADoT operates 29 e-buses, with an additional 30 zero-emission buses expected to be operating by Summer 2022 (image credit: Proterra)

The Los Angeles Department of Transportation (LADOT) is using $6 million to install an electric vehicle (EV) charging microgrid to power more than 100 buses. 

The solar and storage microgrid paired with the EV chargers will support the LADoT's adoption of electric buses as it transitions to a fully electric fleet by 2028. It will be located at the department’s Washington Bus Yard. 

The project is expected to reduce greenhouse gas emissions, lower the LADoT’s electricity costs, and provide emergency back-up power that will enable the agency to continue to operate in an outage. 

The LADoT is to deploy 1.5 megawatts of rooftop and bus solar canopy paired with a 4.5MWh energy storage system provided by Apparent to help power five Proterra 1.5-megawatt fleet chargers with 104 remote EV charging dispensers. The microgrid will utilise Apparent’s intelligent grid operating system platform to integrate Proterra Energy’s charging infrastructure with energy generation to coordinate how and when the electric buses are charged with energy generated from solar, or drawn from storage or the utility.

Los Angeles mayor Eric Garcetti says: “Los Angeles is on track to achieve a zero-emission future and our investments in clean transportation systems are driving that progress. The more electric vehicles we put on our streets today, the more we can lower emissions to ensure a healthier, more sustainable tomorrow.” 

LADoT general manager Seleta Reynolds says: “Meeting our climate and sustainability goals requires persistent investment and urgent action. This grant provides an essential support facility as we move closer to our goal of a fully electric fleet.” 

The California Energy Commission provided the funding for the charging system. 

Earlier this year, Proterra delivered its 25th battery-electric ZX5 transit bus to support the LADoT's transition to a fully electric fleet. The department currently operates 29 EV buses in its fleet, with 30 additional zero-emission buses expected to be in operation by Summer 2022.
 

For more information on companies in this article

Related Content

  • Downtown Chattanooga gets smarter
    January 10, 2023
    Seoul Robotics will deliver 86 new smart city intersections in Tennessee city
  • ChargeWheel sparks mobile EV charging in San Francisco
    April 8, 2019
    ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area. The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park. The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 electric
  • California to set up statewide BEV charging network
    March 27, 2012
    The US state of California has announced a statewide US$120 million battery electric vehicle (BEV) charging station network to supply 10,000 retrofitted charging systems at areas such as individual offices and homes, along with at least 200 public charging stations. Under the scheme, announced by Governor Jerry Brown, all major California cities are to have the charging infrastructure to be BEV-ready by 2015 with the state having a charging infrastructure that can support one million zero-emission vehicles
  • Uber files LADoT lawsuit over Jump data
    April 1, 2020
    Uber, owner of the Jump bike-share brand, has filed a lawsuit against the Los Angeles Department of Transportation (LADoT) to contest what it calls the unlawful implementation of the Mobility Data Specification (MDS).