Skip to main content

Kapsch traffic management for Chile

Kapsch TrafficCom has been awarded a US$860,000 contract to implement and operate a new variable message sign (VMS) system on the only access road to El Teniente copper mine, Chile. The system is the first stage of a planned traffic management system. Situated around 80km south of the capital city of Santiago de Chile in the Andes mountains, El Teniente is the world’s largest underground copper mine, operated by the state-owned mining company Codelco. More than 10,000 miners are transported to and from th
June 21, 2013 Read time: 2 mins

4984 Kapsch TrafficCom has been awarded a US$860,000 contract to implement and operate a new variable message sign (VMS) system on the only access road to El Teniente copper mine, Chile.  The system is the first stage of a planned traffic management system.

Situated around 80km south of the capital city of Santiago de Chile in the Andes mountains, El Teniente is the world’s largest underground copper mine, operated by the state-owned mining company Codelco.  More than 10,000 miners are transported to and from the mine every day, in 500 buses.  Strict safety regulations mean that while the buses are on the road, trucks loaded with copper ore or any other vehicles are prohibited from using the route.

The road is currently closed on an alternating basis in order to avoid collisions; installation of the VMS system will improve the road’s safety and efficiency.  Three types of VMS are to be installed, with nine main and eight secondary panels and a central control system which collects traffic information and displays messages on the VMS. Kapsch’s solution can be integrated seamlessly into the future main traffic management system.

For more information on companies in this article

Related Content

  • SNCF uses ITS to make crossings safer
    May 19, 2021
    There are too many deaths where road and rail intersect: Virginie Taillandier, smart level crossing project manager at French rail group SNCF, outlines how ITS communications can help
  • Tech combo used to target overweight vehicles
    November 7, 2013
    UK enforcement agency VOSA is using a combination of ANPR and weigh-in-motion technology to detect and target overweight trucks on some of the busiest motorways. Overloaded vehicles pose a potential danger to drivers, other road users and pedestrians.
  • ITS asset management matters
    April 26, 2013
    Maintenance of on-road ITS kit needs to become more sophisticated; while new technologies can deliver better road maintenance. David Crawford investigates both sides of the issue "Good information is key to effective ITS asset maintenance,” says Ian Routledge of the Ian Routledge Consultancy (IRC), whose Imtrac (Information Management for TRAffic Control) system is poised for European expansion. Developed as an ‘intelligent filing cabinet’ for storing information about on-road equipment, the online database
  • SmartMobility Road Suite for Saudi Arabia
    June 25, 2012
    Telvent GIT has been awarded a contract by Almabani General Contractors to implement the SmartMobility Road Suite solution on the extension of roads in Arriyadh Old Airport area. The project, led by the High Commission for the Development of Arriyadh, will extend the existing north-south and east-west highways for more than 11km including construction of three tunnels. Telvent’s SmartMobility Road Suite, based on the company’s control and data acquisition system (OASyS SCADA), will allow centralisation of