Skip to main content

Kapsch traffic management for Chile

Kapsch TrafficCom has been awarded a US$860,000 contract to implement and operate a new variable message sign (VMS) system on the only access road to El Teniente copper mine, Chile. The system is the first stage of a planned traffic management system. Situated around 80km south of the capital city of Santiago de Chile in the Andes mountains, El Teniente is the world’s largest underground copper mine, operated by the state-owned mining company Codelco. More than 10,000 miners are transported to and from th
June 21, 2013 Read time: 2 mins

4984 Kapsch TrafficCom has been awarded a US$860,000 contract to implement and operate a new variable message sign (VMS) system on the only access road to El Teniente copper mine, Chile.  The system is the first stage of a planned traffic management system.

Situated around 80km south of the capital city of Santiago de Chile in the Andes mountains, El Teniente is the world’s largest underground copper mine, operated by the state-owned mining company Codelco.  More than 10,000 miners are transported to and from the mine every day, in 500 buses.  Strict safety regulations mean that while the buses are on the road, trucks loaded with copper ore or any other vehicles are prohibited from using the route.

The road is currently closed on an alternating basis in order to avoid collisions; installation of the VMS system will improve the road’s safety and efficiency.  Three types of VMS are to be installed, with nine main and eight secondary panels and a central control system which collects traffic information and displays messages on the VMS. Kapsch’s solution can be integrated seamlessly into the future main traffic management system.

Related Content

  • Caltrans develops remote remedy for ailing VMS
    February 18, 2014
    A remote diagnostic system for variable message signs keeps Caltrans staff safer and makes them more efficient. District 12 of the California Department of Transportation (Caltrans) maintains roads in Orange County including 292 route miles of freeway lanes and 240 directional miles of full-time high occupancy vehicle or carpool lanes. All of these lanes are controlled from the district’s transportation management centre (TMC) using a network of 58 variable message signs (VMS) positioned alongside or abo
  • Close shave for Brazilian project
    June 12, 2015
    Signing the order to equip a new control room just 45 days before the city hosts a major sporting event is challenging - but some deadlines just cannot be moved. There is nothing like a deadline to concentrate minds and effort as Mitsubishi and the Brazilian city of Belo Horizonte discovered in the run-up to the 2014 World Cup. Although municipal authorities had been considering a new command centre for years, it was the hosting of the World Cup last summer that provided the final impetus.
  • Asking drivers what information they need: radical but effective
    March 19, 2014
    When Texas A&M Transportation Institute was asked to devise a temporary traveller information system for work zones, it started by asking drivers what they need. Robert Brydia explains the thinking, implementation and results. US Interstate 35 (I-35) runs roughly north–south originating in Laredo, Texas and ends 1,500 miles away in Duluth, Minnesota having passed through Oklahoma, Kansas, Missouri and Iowa. Within Texas the I-35 splits into I-35E and I-35W passing through Dallas and Fort Worth respectiv
  • Carbon finance delivers critical support to mass transit schemes
    February 2, 2012
    David Crawford investigates carbon finance in transport. World Bank carbon finance grants are delivering critical support to major mass transit deployments in emerging and developing economies. Only recently operative in the transport sector, the Clean Development Mechanism (CDM, see panel) is designed to generate additional income streams and improve internal rates of return on projects funded from public- and private-sector sources.