Skip to main content

Intelligent Transport System for Australia's Monash Freeway

Sluggish peak-hour traffic on Melbourne's busiest road, the Monash Freeway, will flow about 20 km/h faster when new technology is introduced, thanks to a US$78.2 million cash injection from the Australian Government to help improve traffic flow, with the money to go towards installing and upgrading intelligent transport systems on a 34.5-kilometre stretch of the road in Melbourne's east. The commitment is intended to be matched by the Victorian government and will go towards technology such as variable spee
May 14, 2013 Read time: 2 mins
Sluggish peak-hour traffic on Melbourne's busiest road, the Monash Freeway, will flow about 20 km/h faster when new technology is introduced, thanks to a US$78.2 million cash injection from the Australian Government to help improve traffic flow, with the money to go towards installing and upgrading intelligent transport systems on a 34.5-kilometre stretch of the road in Melbourne's east.

The commitment is intended to be matched by the Victorian government and will go towards technology such as variable speed limits, electronic signs directing vehicles between lanes, new entry ramp signals and hard shoulder running during peak hour.

The changes will help peak-hour traffic flow at up to 75 km/h, an improvement of between 14 km/h and 21 km/h on current speeds, the federal government estimates.

''Retrofitting the motorway with this cutting-edge technology would give authorities the tools to better manage traffic flows, respond quickly to accidents and deliver real-time information to motorists so they can plan their journeys and avoid frustrating delays,'' federal transport minister Anthony Albanese said.

''It's all about getting the most out of the infrastructure we've already built, which is a far smarter and cheaper option than simply building more and bigger roads.''

Related Content

  • July 9, 2014
    Work starts on more UK smart motorways
    Three new major motorway schemes on the M1 and M3 will cut congestion and give Britain's drivers smoother, quicker journeys, Transport Secretary Patrick McLoughlin has announced. Construction will now start on the M1 junctions 28-31 in Derbyshire, M1 junctions 32-35a in South Yorkshire and on the M3 at junction 2-4a in Surrey. The new schemes are central to the Government's long term economic plan and part of US$41 billion of investment in the road network by 2021, which will see spending tripled to U
  • November 9, 2015
    Bedfordshire police speed camera proposals ‘unhelpful’
    A UK enforcement expert and the Institute of Advanced Motorists (IAM) have branded as ‘unhelpful’ the proposal by Olly Martins, Police Commissioner for Bedfordshire to use money from speed camera fines to fill a shortfall in police funding. Martins told the Home Affairs Select Committee that the force was ‘stretched to the limit’ and said, "We’ve extensively lobbied the Home Office for fair funding but they haven’t listened and the Chancellor's spending review at the end of the month means we face more c
  • January 30, 2012
    Mounting benefits of dynamic tolling project
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • March 31, 2023
    Transurban lights up tunnel to help drivers pace themselves
    Steep exit from Burnley Tunnel creates congestion for Melbourne's wider road network