Skip to main content

Improved safety information in M55 signs upgrade

A US$567,000 (£450,000) Highways England project to provide drivers using the M55 in Lancashire with better warnings about congestion, incidents and bad weather has been completed. Five of the latest electronic variable message signs, which can display pictorial as well as text messages, have been installed along the eastern end of the motorway between junction 1 at Broughton and the interchange with junction 32 of the M6. The new signs will allow Highways England traffic officers at the North West Re
December 12, 2016 Read time: 2 mins
A US$567,000 (£450,000) 8101 Highways England project to provide drivers using the M55 in Lancashire with better warnings about congestion, incidents and bad weather has been completed.

Five of the latest electronic variable message signs, which can display pictorial as well as text messages, have been installed along the eastern end of the motorway between junction 1 at Broughton and the interchange with junction 32 of the M6.

The new signs will allow Highways England traffic officers at the North West Regional Control Centre at Newton-le-Willows and colleagues at the National Traffic Operation Centre in Birmingham, to give clearer information – with the internationally-recognised symbols helping to warn drivers of dangers ahead including accidents, congestion, snow and ice, high winds or an increased skid risk.

The signs will operate traditionally, using only text messaging, until the spring when a programmed national software update will take place, allowing pictograms to be used as well.

Related Content

  • MVIS VMS solution deployed on Highways England’s road upgrade project
    September 4, 2017
    Mobile Visual Information Systems (MVIS) has implemented its DATEX journey time solution (JTS) on Highway’s England’s US$1.9 billion (£1.5billion) A14 Cambridge to Huntingdon upgrade scheme, enabling an average of 85,000 drivers daily who use the 21 mile stretch of road to navigate the roadworks. The project incorporates 26 Bartco UK VMS-Cs variable message signs which display journey times from their locations to the end of the affected stretch of road
  • Drivers urged: ‘Don’t put road workers lives at risk’
    May 23, 2018
    A road junction in Merseyside, UK, has become a hotspot for life-threatening incidents to construction workers, says Highways England. Contractors have reported 23 incidents in two months where their safety has been put at risk by drivers ignoring overnight closures. Road users have driven into roadworks for the £3m improvement project at Switch Island, where the M57, M58 and three A roads all join. One lorry driver travelled through the construction area without stopping - forcing workers to get out
  • Vaisala says it’s time to take road weather seriously
    October 12, 2016
    “It is time to take road weather seriously,” is how Vaisala’s Danny Johns puts the company’s message to this week’s ITS World Congress delegates, and the wider world. While the monitoring of winter weather is well established, wind, rain and poor visibility can occur at any time of the year and have significant impacts on traffic flows and crash statistics. “We are now mapping road networks to identify weather-sensitive areas to best locate road weather stations – it doesn’t take a lot of rain or wind to
  • Video: giant gantry is lifted overnight on the M6, UK
    October 8, 2018
    Highways England has released timelapse footage which shows a 20-tonne gantry being lifted over the M6 during an overnight operation in June. The 40m-wide structure will host 10 electronic signs between junctions 18 and 19 is being installed as part of a £274 million smart motorway project in Cheshire. The scheme will be completed in phases with all roadworks due to be removed by Spring 2019.