Skip to main content

Graham Construction wins ITS system contract on Forth replacement crossing

Graham Construction has won the contract, worth over US$21 million, to provide the state-of-the-art ITS for the new Forth Bridge replacement crossing in Scotland. The company will deliver the traffic flow management system along the M90 to control traffic flow using overhead signal gantries and provide motorists with current travel updates via variable message boards. The ITS contract is to provide and install seventeen gantries, along with foundations and associated maintenance lay-bys. Further work wi
April 19, 2012 Read time: 1 min
5033 Graham Construction has won the contract, worth over US$21 million,  to provide the state-of-the-art ITS for the new Forth Bridge replacement crossing in Scotland. The company will deliver the traffic flow management system along the M90 to control traffic flow using overhead signal gantries and provide motorists with current travel updates via variable message boards.

The ITS contract is to provide and install seventeen gantries, along with foundations and associated maintenance lay-bys. Further work will include landscaping, ducting, cabling and installing carriageway traffic detectors

For more information on companies in this article

Related Content

  • Romanian rail line to be modernised
    December 6, 2013
    Romanian state railway company CFR SA has awarded a contract worth US$519 million to a consortium including Strabag for the modernisation of the 42.2 kilometre long railway section between Vințu de Jos and Simeria in western Romania near the city of Sibiu. The modernisation works comprise the renovation of the railway section, including five stations located outside of the densely populated residential areas, rerouting of the track, tunnelling and bridge building as well as the track bed structure. In t
  • Oregon DOT wins Best of ITS 2015 award
    August 14, 2015
    The Oregon Department of Transportation improved safety on OR 217 by implementing a variety of signage and roadway enhancements. OR 217 currently experiences traffic congestion during peak commute times because of high-density traffic and crashes. The project focused on reducing crashes, helping to clear crashes quickly when they do occur, and giving motorists the ability to make informed travel decisions about traffic flow and roadway conditions. Since collisions on a busy highway can bring traffic to a h
  • Indra to upgrade Algeria’s Bouïra tunnel
    September 2, 2015
    The National Road Agency of Algeria (ANA) has awarded a contract for the modernisation of the Bouïra tunnel to a consortium comprising of the state construction company Cosider TP and Indra. The contract, which is worth US$12.3 million to Indra, will run for 15 months. It will deliver an integrated management solution and intelligent traffic systems for the tunnel, which is located on the east-west highway and crosses the country from the border with Tunisia to the border with Morocco and sees the heavi
  • Dynamic messaging has its drawbacks
    December 5, 2018
    Dynamic message signs are a proven means of getting information to drivers on the road – but they have their drawbacks. Robert Gordon looks at the possibilities of expanding DMS capability by bringing that information into the cars themselves Delivery of traffic information to motorists by dynamic message signs (DMS) has proven to be popular and is a principal tool for conveying information developed by the traffic management centre (TMC) to the public. There are, however, limitations in the use of ph