Skip to main content

Graham Construction wins ITS system contract on Forth replacement crossing

Graham Construction has won the contract, worth over US$21 million, to provide the state-of-the-art ITS for the new Forth Bridge replacement crossing in Scotland. The company will deliver the traffic flow management system along the M90 to control traffic flow using overhead signal gantries and provide motorists with current travel updates via variable message boards. The ITS contract is to provide and install seventeen gantries, along with foundations and associated maintenance lay-bys. Further work wi
April 19, 2012 Read time: 1 min
5033 Graham Construction has won the contract, worth over US$21 million,  to provide the state-of-the-art ITS for the new Forth Bridge replacement crossing in Scotland. The company will deliver the traffic flow management system along the M90 to control traffic flow using overhead signal gantries and provide motorists with current travel updates via variable message boards.

The ITS contract is to provide and install seventeen gantries, along with foundations and associated maintenance lay-bys. Further work will include landscaping, ducting, cabling and installing carriageway traffic detectors

For more information on companies in this article

Related Content

  • Yunex takes on £200m, 10-year London signal deal
    March 28, 2023
    Transport for London chooses Yunex for the contract which begins in August 2023
  • Kapsch TrafficCom wins PANYNJ toll system contract
    July 26, 2016
    The Port Authority of New York and New Jersey (PANYNJ) has awarded Kapsch TrafficCom a US$147 million contract to replace all roadside equipment in the mixed-mode, dedicated mode and express toll lanes at all bridges and tunnels managed by Authority. Under the first collaborative project between Kapsch TrafficCom and its recently-acquired Schneider Electric transportation business division, Kapsch will replace the toll collection system at PANYNJ’s bridge and tunnel facilities, as well as carry out ongoi
  • UK defaults to hard shoulder running to expand motorway capacity
    April 8, 2014
    Hard shoulder running has become the UK’s default response to increasing motorway capacity as Colin Sowman reports. Facing a predicted 46% increase in traffic levels by 2040 and the current economic recovery leading to more people travelling to, from and for work leaves the UK government under short- and long-term pressure to increase the capacity on the main motorway network. Particular sections of motorways are already experiencing repeated, sometimes tidal, congestion and both tight Treasury limits and t
  • Section of M6 motorway to be made ‘smart’
    November 1, 2013
    A section of the M6 motorway in the UK between junctions 10a and 13 is to be upgraded to a smart (managed) motorway with all-lane running. This section of the motorway is a major strategic route, carrying around 120,000 vehicles per day.