Skip to main content

FHWA targets border congestion with technology

To reduce delays at US border crossings in New York, Michigan and Washington, the US Department of Transportation’s Federal Highway Administration (FHWA) has awarded US$256,470 for the use of innovative new technology that will provide information on wait times at border crossings and help manage delay by giving truckers advance notice of crossing conditions. FHWA’s Border Wait Time Deployment Initiative is designed to accelerate the adoption of innovative technology, such as sensors, to measure delay an
June 6, 2016 Read time: 2 mins
To reduce delays at US border crossings in New York, Michigan and Washington, the 324 US Department of Transportation’s 831 Federal Highway Administration (FHWA) has awarded US$256,470 for the use of innovative new technology that will provide information on wait times at border crossings and help manage delay by giving truckers advance notice of crossing conditions.

FHWA’s Border Wait Time Deployment Initiative is designed to accelerate the adoption of innovative technology, such as sensors, to measure delay and wait times at land border ports of entry. The program supports the collection and dissemination of real-time traveller information to improve the reliability of goods movement across these borders.  

Under the initiative, FHWA will provide US$100,000 to the 1780 New York State Department of Transportation for its Niagara Falls International Rainbow Bridge, along with funding of US$95,920 to the 1688 Michigan Department of Transportation for technology at the Detroit-Windsor Tunnel Crossing with a grant. FHWA will also award US$60,550 to the Whatcom Council of Governments (WCOG) in Whatcom County, Washington, for the Booth Integration project. All of these research projects will use dynamic message signs and advance traveller information systems to convey the border wait times.

In recent years, trucker wait time and unexpected delays have been identified as an impediment to the free flow across the border, and the FHWA has undertaken several research initiatives aimed at measuring border delays at major land-border crossings.

Related Content

  • Diversity dominates ITS recruitment workshop
    October 27, 2016
    ITS offers more interesting and engaging careers than other engineering disciplines because it is less component-based and gives more importance to human factors and the integration of other domains. So says the report from a multinational recruitment stakeholder workshop staged by ITS(UK) at the 2016 ITS in Europe Congress.
  • Managed motorways, hard shoulder running aids safety, saves time
    January 30, 2012
    The announcement that, in 2012/13, work to extend Managed Motorways to Junctions 5-8 of the M6 near Birmingham in the West Midlands is scheduled to start marks the next step for the UK's hard shoulder running concept, first introduced on the M42 in 2006. The M6 scheme is in fact one of several announced; over the next few years work will start on applying Managed Motorways to various sections of the M1, M25 London Orbital, M60 and M62. According to Paul Unwin, senior project manager with the Highways Agency
  • ERF launches position paper aimed at improving Europe’s traffic signs
    November 10, 2015
    The European Union Road Federation (ERF) has launched its position paper, Improved Signage for better Roads: An ERF Position Paper towards improving Traffic Signs in European Roads, which is aimed at a broad range of stakeholders and seeks to identify key actions that ERF and its members believe should be prioritised so that traffic signs can continue serving the needs of Europe’s road users. Vertical signage is an essential element not only of a modern and well-maintained road infrastructure, but also o
  • Trans-Pennine road tunnel routes shortlisted, may include special lighting, caverns
    August 19, 2016
    Five routes have been shortlisted for the Trans-Pennine tunnel – the most ambitious road scheme undertaken in the UK in more than five decades. The Trans-Pennine tunnel study was launched by the government in autumn 2015, one of a number of studies aimed at addressing some of the biggest challenges facing the road network in the UK. The latest interim study shows the continued strong case for the tunnel which could provide safer, faster and more reliable journeys for motorists. All five routes join th