Skip to main content

FHWA targets border congestion with technology

To reduce delays at US border crossings in New York, Michigan and Washington, the US Department of Transportation’s Federal Highway Administration (FHWA) has awarded US$256,470 for the use of innovative new technology that will provide information on wait times at border crossings and help manage delay by giving truckers advance notice of crossing conditions. FHWA’s Border Wait Time Deployment Initiative is designed to accelerate the adoption of innovative technology, such as sensors, to measure delay an
June 6, 2016 Read time: 2 mins
To reduce delays at US border crossings in New York, Michigan and Washington, the 324 US Department of Transportation’s 831 Federal Highway Administration (FHWA) has awarded US$256,470 for the use of innovative new technology that will provide information on wait times at border crossings and help manage delay by giving truckers advance notice of crossing conditions.

FHWA’s Border Wait Time Deployment Initiative is designed to accelerate the adoption of innovative technology, such as sensors, to measure delay and wait times at land border ports of entry. The program supports the collection and dissemination of real-time traveller information to improve the reliability of goods movement across these borders.  

Under the initiative, FHWA will provide US$100,000 to the 1780 New York State Department of Transportation for its Niagara Falls International Rainbow Bridge, along with funding of US$95,920 to the 1688 Michigan Department of Transportation for technology at the Detroit-Windsor Tunnel Crossing with a grant. FHWA will also award US$60,550 to the Whatcom Council of Governments (WCOG) in Whatcom County, Washington, for the Booth Integration project. All of these research projects will use dynamic message signs and advance traveller information systems to convey the border wait times.

In recent years, trucker wait time and unexpected delays have been identified as an impediment to the free flow across the border, and the FHWA has undertaken several research initiatives aimed at measuring border delays at major land-border crossings.

Related Content

  • LA metro secures federal funds for rail projects
    February 19, 2016
    The US Department of Transportation has awarded US$300 million to the Los Angeles County Metropolitan Transportation Authority (Metro) for two major rail projects in Los Angeles County. This federal funding will benefit both the Regional Connector and Westside Purple Line Extension (Sections 1 and 2) transit projects. Specifically, the federal government will be providing US$100 million to the Regional Connector and US$200 million for the Westside Purple Line section 1 and 2 extension this federal fisca
  • Charging station infrastructure boost to electric vehicle use
    July 17, 2012
    The first section of a planned network of stations for charging electric vehicles – the West Coast Electric Highway – opened in March, promising a welcome boost to the environment and economy of Oregon. Pete Goldin reports What should come first, the electric vehicle or the charging station? This dilemma has been hindering proliferation of ‘EVs’ in the US for years. Without a widespread and reliable infrastructure of charging stations, the American public is not likely to adopt EVs en masse. This may all b
  • New system to prevent Hazchem and over-height vehicles entering tunnel
    August 20, 2015
    An impending move to free-flow charging prompted a search for automated dangerous goods identification and over-height detection systems at the Thames Crossing to the east of London. Manned toll booths are increasingly being consigned to history by the onslaught of all-electronic charging. However, a secondary function of the traditional manned plazas has been to prevent non-compliant vehicles using the facility or to tell a driver that that they need to use a specific lane or wait for an escort. Automating
  • Iteris awarded major MAP-21 services contract
    August 29, 2014
    Iteris is to help transportation agencies with the various elements of Moving Ahead for Progress in the 21st Century (MAP-21) requirements under a US$1.2 million task order awarded by the National Highway Institute (NHI). The contract also includes assistance with the implementation of performance measures into their existing planning processes. These programs assist federal, state, and local agencies to comply with MAP-21 performance management provisions. “This new task order further reflects our posit