Skip to main content

Cheshire’s M6 to become smart motorway

Draft regulations to introduce variable mandatory speed limits as part of the planned smart motorway upgrade to 18 and a half miles of the M6 in Cheshire were published this week for consultation with key stakeholders. Highways England is planning to start construction work on the US$299 to US$427 million project between junction 16 at Crewe and junction 19 at Knutsford later this year. The hard shoulder will be converted into a permanent extra running lane and smart motorway technology installed to give
July 2, 2015 Read time: 2 mins
Draft regulations to introduce variable mandatory speed limits as part of the planned smart motorway upgrade to 18 and a half miles of the M6 in Cheshire were published this week for consultation with key stakeholders.

8101 Highways England is planning to start construction work on the US$299 to US$427 million project between junction 16 at Crewe and junction 19 at Knutsford later this year. The hard shoulder will be converted into a permanent extra running lane and smart motorway technology installed to give drivers more reliable journeys. Variable mandatory speed limits will be used to manage traffic speeds and help reduce congestion, whilst enabling safe operation of the motorway.

Introducing the variable mandatory speed limits on the motorway requires new regulations. These new draft regulations have been published for comment with consultation packs being sent to key stakeholders, such as local authorities, transport associations and emergency services.

Construction of the smart motorway scheme is scheduled to start between October and December this year.

Related Content

  • June 2, 2015
    AMG camera technology implemented on major motorways
    UK manufacturer of CCTV transmission systems, AMG, has completed the supply of a range of hybrid transmission systems for P&D Specialist Services for the M1, M3, M60 and M62 motorways to ensure safe traffic flow during roadworks. A total of 329 cameras has been installed over 99 kilometres of the motorways, including a 35 kilometre stretch of the M60/M62 as part of the Manchester smart motorways scheme. A new project to introduce a stretch of managed motorway on a 23 kilometre section of the M1 betwe
  • June 12, 2015
    Temporary CCTV poses more challenges than permanent installations
    Long-term roadworks pose particular problems for temporary surveillance installations. Converting the hard shoulder to a running lane, either full- or part-time, is the UK Highways Agency’s solution to ease motorway congestion. This is leading to a number of long-term projects where large stretches of the hard shoulder are closed off by temporary concrete barriers and during these roadwork programmes, temporary CCTV cameras are deployed to monitor and record vehicle traffic and workers.
  • January 27, 2020
    38 deaths on smart motorways in last five years, BBC reveals 
    The UK government has told the BBC’s Panorama investigation programme that 38 people have been killed on smart motorways in the last five years. 
  • March 7, 2023
    Swarco sets up live-lane running on Germany's A8
    System spans 2.8km along hard shoulder of motorway between Karlsruhe and Karlsbad