Skip to main content

FDOT to rebuild major segment of I-4

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
September 10, 2014 Read time: 3 mins

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas.

Known as the I-4 Ultimate, the project is part of the 54-year-old I-4 corridor, which runs 73 miles between Tampa and Daytona Beach and serves several of the region's key north-south corridors, such as Florida's Turnpike and I-95.

The project completely reconstructs 21 miles of I-4 from west of Kirkman Road in Orange County to east of State Road 434 in Seminole County. Along with making this a signature corridor with details on the aesthetics and landscaping, the I-4 Ultimate project will provide a choice to motorists by adding four variable tolled Express Lanes to I-4 while maintaining the existing free general use lanes.

The design phase of the project will begin within the next month and 4503 Florida Department of Transportation (FDOT) anticipates construction will begin in early 2015. Through the P3 delivery model, the concessionaire, I-4 Mobility Partners OpCo, was able to provide significant technical enhancements, including direct connections from the express lanes to SR 408, additional auxiliary lanes and an additional pedestrian bridge along the facility, as compared to FDOT’s base scope requirements while still staying below FDOT’s affordability limit.

"We've been able to move this project from the financing drawing board to breaking ground in near record time because of the Department's early involvement," said Secretary Foxx. "The I-4 Ultimate is the sort of highway improvement America's drivers need and it underscores the importance of passing the President's Grow America Act to make more investments to modernize our aging roads to keep up with future demands."

"Without a loan like this, Orlando's I-4 would have continued to age requiring even more costly fixes in the years ahead, creating additional traffic delays without any hope of congestion relief," said Acting Federal Highway Administrator Gregory Nadeau. "The travel demands in this area of Florida continue to grow, which is why the I-4 Ultimate is the right solution at the right time."

For more information on companies in this article

Related Content

  • Iteris wins traffic light synchronisation project along major California corridor
    April 19, 2012
    Iteris has been selected by the Orange County Transportation Authority (OCTA) to synchronise 68 traffic lights along Katella Avenue in Orange County, California, as part of the Proposition 1B - Traffic Light Synchronization Program (TLSP). The contract, valued at $674,000, is expected to begin immediately.
  • IBTTA applauds new interstate study
    September 13, 2013
    A new study, Interstate 2.0: Modernising the Interstate Highway System via Toll Finance, by US public policy think tank, the Reason Foundation, details how much it will cost to reconstruct and widen Interstate highways in all 50 states and shows how to pay for the modernisation efforts with toll revenues. It makes the case for lifting the federal prohibition on tolling existing lanes of the Interstate highway system and states: “…as the reality of the cost of Interstate reconstruction and modernisation s
  • FHWA proposes new performance measures to reduce highway congestion
    April 19, 2016
    The US Department of Transportation’s Federal Highway Administration (FHWA) today released a proposed regulation outlining new performance measures to assess travel reliability, congestion, and emissions at a national level. It calls for an increased level of transparency and accountability in establishing and achieving targets for performance impacting commuters and truck drivers. The measures address the concerns outlined in the USDOT report Beyond Traffic, which examines the trends and choices facing
  • US IntelliDrive cooperative infrastructure programme
    February 2, 2012
    The 'rebranding' of the US's Vehicle-Infrastructure Integration programme as IntelliDrive marks an effort to make the whole undertaking more accessible both in terms of nomenclature and technology. Shelley Row, director of the ITS Joint Program Office within USDOT's Research and Innovative Technology Administration, talks about the changes