Skip to main content

FDOT to rebuild major segment of I-4

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
September 10, 2014 Read time: 3 mins

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas.

Known as the I-4 Ultimate, the project is part of the 54-year-old I-4 corridor, which runs 73 miles between Tampa and Daytona Beach and serves several of the region's key north-south corridors, such as Florida's Turnpike and I-95.

The project completely reconstructs 21 miles of I-4 from west of Kirkman Road in Orange County to east of State Road 434 in Seminole County. Along with making this a signature corridor with details on the aesthetics and landscaping, the I-4 Ultimate project will provide a choice to motorists by adding four variable tolled Express Lanes to I-4 while maintaining the existing free general use lanes.

The design phase of the project will begin within the next month and 4503 Florida Department of Transportation (FDOT) anticipates construction will begin in early 2015. Through the P3 delivery model, the concessionaire, I-4 Mobility Partners OpCo, was able to provide significant technical enhancements, including direct connections from the express lanes to SR 408, additional auxiliary lanes and an additional pedestrian bridge along the facility, as compared to FDOT’s base scope requirements while still staying below FDOT’s affordability limit.

"We've been able to move this project from the financing drawing board to breaking ground in near record time because of the Department's early involvement," said Secretary Foxx. "The I-4 Ultimate is the sort of highway improvement America's drivers need and it underscores the importance of passing the President's Grow America Act to make more investments to modernize our aging roads to keep up with future demands."

"Without a loan like this, Orlando's I-4 would have continued to age requiring even more costly fixes in the years ahead, creating additional traffic delays without any hope of congestion relief," said Acting Federal Highway Administrator Gregory Nadeau. "The travel demands in this area of Florida continue to grow, which is why the I-4 Ultimate is the right solution at the right time."

For more information on companies in this article

Related Content

  • GIS-based state of the art emergency response, damage recovery
    January 26, 2012
    The gecko is one of several members of the lizard family which demonstrate autotomy: the ability to re-grow a tail or some other appendage lost during a time of peril. The GITA's GECCo programme is looking to give US infrastructures much the same capability
  • US incident management needs national standardisation
    January 26, 2012
    I-95 Corridor Coalition's Tom Martin discusses the state of the art in incident management and what visitors to this year's ITS World Congress can expect of the first ever Emergency Responder-Incident Management Day. Developments in incident management are driven in the main by need. A bald statement, and one which holds no surprises, it nevertheless quantifies the evolutionary process within the I-95 Corridor Coalition over the last decade and more. Spread over 16 states from Maine to Florida, the Coalitio
  • Kapsch wins Texas tolling projects
    July 31, 2012
    Kapsch TrafficCom IVHS, a subsidiary of Kapsch TrafficCom, has been selected to design, build, and integrate the managed lane system (MLS) for both the North Tarrant Express (NTE) and LBJ Express projects in Dallas and Tarrant Counties in North Texas.
  • Benefits of traffic light synchronisation
    January 27, 2012
    Alicia Parkway corridor, located in Orange County, California, was part of Phase 1 of an inter-jurisdictional Traffic Light Synchronisation Programme (TLSP) in Orange County designed to increase mobility and overall drive quality while reducing fuel consumption and greenhouse gas emissions. By increasing average speeds and reducing travel times via the reduction in stops, the programme sought to reduce vehicle acceleration and deceleration events along the corridor; these have been identified as the leadin