Skip to main content

FDOT to rebuild major segment of I-4

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
September 10, 2014 Read time: 3 mins

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas.

Known as the I-4 Ultimate, the project is part of the 54-year-old I-4 corridor, which runs 73 miles between Tampa and Daytona Beach and serves several of the region's key north-south corridors, such as Florida's Turnpike and I-95.

The project completely reconstructs 21 miles of I-4 from west of Kirkman Road in Orange County to east of State Road 434 in Seminole County. Along with making this a signature corridor with details on the aesthetics and landscaping, the I-4 Ultimate project will provide a choice to motorists by adding four variable tolled Express Lanes to I-4 while maintaining the existing free general use lanes.

The design phase of the project will begin within the next month and 4503 Florida Department of Transportation (FDOT) anticipates construction will begin in early 2015. Through the P3 delivery model, the concessionaire, I-4 Mobility Partners OpCo, was able to provide significant technical enhancements, including direct connections from the express lanes to SR 408, additional auxiliary lanes and an additional pedestrian bridge along the facility, as compared to FDOT’s base scope requirements while still staying below FDOT’s affordability limit.

"We've been able to move this project from the financing drawing board to breaking ground in near record time because of the Department's early involvement," said Secretary Foxx. "The I-4 Ultimate is the sort of highway improvement America's drivers need and it underscores the importance of passing the President's Grow America Act to make more investments to modernize our aging roads to keep up with future demands."

"Without a loan like this, Orlando's I-4 would have continued to age requiring even more costly fixes in the years ahead, creating additional traffic delays without any hope of congestion relief," said Acting Federal Highway Administrator Gregory Nadeau. "The travel demands in this area of Florida continue to grow, which is why the I-4 Ultimate is the right solution at the right time."

For more information on companies in this article

Related Content

  • FDOT partners with Florida Poly to develop transportation test facility
    September 29, 2016
    The Florida Department of Transportation (FDOT) and Florida Polytechnic University are to partner in a new transportation technology testing facility, SunTrax, to create a high-tech hub for the research, development and testing of emerging transportation technologies related to tolling, intelligent transportation systems (ITS) and automated and connected vehicles. The initial phase of the project will focus on the construction of a toll testing facility expected to offer local and potentially national a
  • Iteris awarded traffic signal synchronisation project
    July 13, 2016
    Orange County Transportation Authority (OCTA), California, has awarded Iteris a US$2.1 million traffic signal synchronisation and communication as part of its on-going mobility enhancements. The project also includes upgrades to traffic signal infrastructure and signal timing improvements along a heavily travelled nine-mile stretch of the Pacific Coast Highway (PCH) in Newport Beach. Iteris will design and implement traffic signal system infrastructure and fibre-optic communications equipment and synchro
  • Moveble barriers improve workzone safety, reduce costs
    January 25, 2012
    Two phases of an arterial reconstruction project in Salt Lake City have provided a compelling cost-based argument for moveable barriers.
  • Funding shortfall for US Interstate upgrades
    May 11, 2012
    Andrew Bardin Williams investigates tolling on the federal Interstate system as maintenance and upgrade requirements increasingly outpace funding The I-95 corridor through North Carolina is one of the most heavy trafficked interstates in the US, seeing upwards of 46,000 vehicles per day in some stretches-and North Carolina’s Department of Transportation (NCDOT) estimates this number will to rise to 98,000 vehicles per day by 2040. Along with the rest of the federal interstate system, the North Carolina str