Skip to main content

FDOT to rebuild major segment of I-4

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
September 10, 2014 Read time: 3 mins

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas.

Known as the I-4 Ultimate, the project is part of the 54-year-old I-4 corridor, which runs 73 miles between Tampa and Daytona Beach and serves several of the region's key north-south corridors, such as Florida's Turnpike and I-95.

The project completely reconstructs 21 miles of I-4 from west of Kirkman Road in Orange County to east of State Road 434 in Seminole County. Along with making this a signature corridor with details on the aesthetics and landscaping, the I-4 Ultimate project will provide a choice to motorists by adding four variable tolled Express Lanes to I-4 while maintaining the existing free general use lanes.

The design phase of the project will begin within the next month and 4503 Florida Department of Transportation (FDOT) anticipates construction will begin in early 2015. Through the P3 delivery model, the concessionaire, I-4 Mobility Partners OpCo, was able to provide significant technical enhancements, including direct connections from the express lanes to SR 408, additional auxiliary lanes and an additional pedestrian bridge along the facility, as compared to FDOT’s base scope requirements while still staying below FDOT’s affordability limit.

"We've been able to move this project from the financing drawing board to breaking ground in near record time because of the Department's early involvement," said Secretary Foxx. "The I-4 Ultimate is the sort of highway improvement America's drivers need and it underscores the importance of passing the President's Grow America Act to make more investments to modernize our aging roads to keep up with future demands."

"Without a loan like this, Orlando's I-4 would have continued to age requiring even more costly fixes in the years ahead, creating additional traffic delays without any hope of congestion relief," said Acting Federal Highway Administrator Gregory Nadeau. "The travel demands in this area of Florida continue to grow, which is why the I-4 Ultimate is the right solution at the right time."

For more information on companies in this article

Related Content

  • Secretary Foxx sends six-year transportation bill to Congress
    March 31, 2015
    Over the past year, US Transportation Secretary Anthony Foxx has visited more than 100 communities and heard one common story about crumbling infrastructure and dwindling resources to fix it with. Foxx has now sent to Congress his solution to this problem: a long-term transportation bill that provides funding growth and certainty so that state and local governments can get back in the business of building things again. The Grow America Act reflects President Obama’s vision for a six-year, US$478 billion
  • PennDOT 511 traveller information system to be privatised
    January 11, 2013
    The Pennsylvania Department of Transport (PennDOT) 511 system, 511PA, and the Pennsylvania Turnpike’s Roadway Information Program (TRIP), are to be privatised, following approval by the Pennsylvania Public Private Transportation Partnership (P3) Board of a project soliciting private sector proposals to manage and operate the systems. In operation since 2009, 511PA provides traffic-delay warnings, weather forecasts, average traffic speeds on urban interstates and access to more than 670 traffic cameras. The
  • Iteris to plan and design Orange County’s ICM project
    October 27, 2016
    Iteris has been awarded a US$2.6 million contract to implement the Integrated Corridor Management (ICM) project in Orange County, California in an effort to improve mobility in the heavily congested Platinum Triangle. The Platinum Triangle confluence of corridors ranked as having the highest vehicle hours of delay in 2012, along with the highest concentration of special events at locations including Disneyland Resort and Theme Park, Angels Stadium, Honda Center and Anaheim Convention Center. This ini
  • Construction begins on I-11 connecting Las Vegas and Phoenix
    April 10, 2015
    Construction has begun on Interstate 11 (I-11), from I-515 to US 93, a 15-mile landmark project that will support Nevada’s continued economic prosperity through enhanced commerce, increased tourism and improved connectivity between Nevada and Arizona as well as beyond to Canada and Mexico. Designated by the federal government as the future highway, I-11 will connect Las Vegas and Phoenix, the only two cities in the nation with populations of more than one million residents not currently linked by an inte