Skip to main content

FDOT to rebuild major segment of I-4

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y
September 10, 2014 Read time: 3 mins

US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas.

Known as the I-4 Ultimate, the project is part of the 54-year-old I-4 corridor, which runs 73 miles between Tampa and Daytona Beach and serves several of the region's key north-south corridors, such as Florida's Turnpike and I-95.

The project completely reconstructs 21 miles of I-4 from west of Kirkman Road in Orange County to east of State Road 434 in Seminole County. Along with making this a signature corridor with details on the aesthetics and landscaping, the I-4 Ultimate project will provide a choice to motorists by adding four variable tolled Express Lanes to I-4 while maintaining the existing free general use lanes.

The design phase of the project will begin within the next month and 4503 Florida Department of Transportation (FDOT) anticipates construction will begin in early 2015. Through the P3 delivery model, the concessionaire, I-4 Mobility Partners OpCo, was able to provide significant technical enhancements, including direct connections from the express lanes to SR 408, additional auxiliary lanes and an additional pedestrian bridge along the facility, as compared to FDOT’s base scope requirements while still staying below FDOT’s affordability limit.

"We've been able to move this project from the financing drawing board to breaking ground in near record time because of the Department's early involvement," said Secretary Foxx. "The I-4 Ultimate is the sort of highway improvement America's drivers need and it underscores the importance of passing the President's Grow America Act to make more investments to modernize our aging roads to keep up with future demands."

"Without a loan like this, Orlando's I-4 would have continued to age requiring even more costly fixes in the years ahead, creating additional traffic delays without any hope of congestion relief," said Acting Federal Highway Administrator Gregory Nadeau. "The travel demands in this area of Florida continue to grow, which is why the I-4 Ultimate is the right solution at the right time."

Related Content

  • September 21, 2015
    Go-ahead for Richmond-to-Raleigh high-speed rail proposal
    The US Department of Transportation (DOT)’s Federal Railroad Administration (FRA), the State of North Carolina and the Commonwealth of Virginia have signed off on the Final Environmental Impact Statement (FEIS) for the proposed Richmond to Raleigh (R2R) passenger rail line along the Southeast Corridor. The completion of the FEIS is one of the final steps necessary before construction of the project can move forward once funding is secured. The 162-mile route between the two cities would utilise existing
  • August 29, 2017
    US DOT awards funding for Maryland Purple Line Project
    The US Department of Transportation’s Federal Transit Administration (FTA) has announced a US$900 million federal grant agreement for the Maryland Purple Line Light Rail Project. The light rail line will make travel across Montgomery and Prince George’s counties faster and more reliable, improving access to major business and activity centres in the state’s most populated counties. The 16.2-mile Maryland Purple Line will connect major activity centres in Bethesda, Silver Spring, Takoma-Langley Park, College
  • January 30, 2012
    Mounting benefits of dynamic tolling project
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • November 28, 2012
    ITS America maps out implications and opportunities for ITS industry
    A critical milestone was reached in July 2012, when the US Congress passed, and President Obama signed, legislation reauthorising the nation's surface transportation programs, breaking a nearly three-year log-jam which had blocked critical transportation reforms and delayed much-needed infrastructure projects. In a town where compromise is sometimes considered an endangered species, Republicans and Democrats came together during a months-long series of negotiations and hashed out a bipartisan agreement that