Skip to main content

TfL cycle superhighways plans will still disrupt traffic, says FTA

The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
January 28, 2015 Read time: 3 mins
The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes.
 
Subject to approval by 1466 Transport for London, construction of the routes will begin in March.
 
Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunities.

Acting on concerns about delays caused to traffic by the east-west route, the final plans now retain two westbound traffic lanes on Upper and Lower Thames Street and Victoria Embankment, while entirely preserving the continuous, kerb-segregated cycle lanes and junctions.
 
These changes reduce the whole-route traffic delay in the morning peak hour, the worst affected time, by 60 per cent compared to previous proposals.

Responding to the announcement, the 6983 Freight Transport Association (FTA) has voiced its disappointment and concern.
 
FTA has stated that whilst it isn’t opposed to cycle superhighways in principle, it is concerned over the speed that the plans are to be introduced saying that these projects will be in place for decades and more time should be spent now getting all of the aspects understood and correct before work begins.
 
The Association added that the root of the problem is the speed with which the Mayor, Boris Johnson, appears to be pushing the changes through.  FTA raised the point that the environmental impact report and business case were only recently published, when versions of these should have been involved in the consultation, and that the final picture on loading restrictions is still not set.
 
FTA’s head of Urban Logistics Christopher Snelling commented that despite there being ‘positives’ in the announcement today, overall the package of routes still raises cause for concern: “The information published on delay times still does not reflect how industry and private motorists actually use these roads.  And yet the first road-works to build these superhighways will start in just a few weeks’ time.  By this April we will see works underway on all the proposed routes, affecting some key routes into the centre of London.  It seems that the target pushing this is the aim to finish the routes by May 2016 – when the Mayor leaves office.”
 
FTA has also said that there will still be considerable impact on traffic not just on the routes themselves, but also across London and even out to the M25, as TfL re-sequences red lights to make it harder for motor traffic to get on the routes.
 
Snelling added that, given the tight constraints of drivers’ hours rules, this could result in significantly increased costs to the logistics industry, increasing costs for the businesses and residents in London who rely on them.
 
He concluded: “The improvements that have been announced today show how careful work can improve the situation to better reflect the balance of London’s transport needs, and the revised plans issued are an improvement on those previously put out – traffic delays have been reduced somewhat and more loading capacity has been added than was planned before.  TfL has also committed today to work further with the freight industry to refine the loading facilities on the routes before they go live, which we welcome.”

Related Content

  • November 11, 2016
    FTA says better enforcement needed to cut mobile phone use
    Plans to double fines and penalties for using a hand-held mobile phone while driving send a strong signal to drivers – but better enforcement is essential, says the Freight Transport Association (FTA). The Department for Transport (DfT) has released its response to the consultation on ‘Penalties for use of a Hand Held Mobile Phone Whilst Driving’ to which FTA contributed. DfT proposes that offenders receive:
  • September 30, 2015
    Mayor unveils expanded traffic-busting plans to keep London moving
    The Mayor of London, Boris Johnson, has unveiled the new measures Transport for London (TfL) is introducing to ease traffic in the capital and minimise disruption on the roads as major work to improve the network continues as part of the Mayor’s US$6 billion Road Modernisation Plan. The innovations include: Trials of new technology - for the first time on the TfL road network a new generation of digital road signs will provide people with real-time information on journeys using major routes into London.
  • September 26, 2017
    Sadiq Khan proposes Cycle Superhighway 9, West London
    London Mayor Sadiq Khan announced consultation of West London’s first segregated lane, Cycle Superhighway 9 (CS9), connecting Kennington Olympia to Brentford. The 6km CS9 follows Khan’s plan to make to encourage cycling and capital’s streets healthier and safer. The segregated tracks will cover Hammersmith Road, King Street, Chiswick High Road, Brentford High Street and Kew Bridge Road, and allow cyclists to bypass Hammersmith Gyratory and Kew Bridge Junction. There will also be five new traffic light
  • February 6, 2015
    HGVs without safety equipment to be banned from London
    Britain’s first Safer Lorry Scheme, a London-wide ban on any lorry not fitted with safety equipment to protect cyclists and pedestrians, has been given the go ahead by the mayor, Transport for London (TfL) and London Councils. The scheme received 90 per cent support in a public consultation Traffic orders implementing the scheme are currently being published. Installation of road signs at the London boundary, training of police officers and information campaigns with drivers and hauliers have all started