Skip to main content

TfL cycle superhighways plans will still disrupt traffic, says FTA

The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
January 28, 2015 Read time: 3 mins
The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes.
 
Subject to approval by 1466 Transport for London, construction of the routes will begin in March.
 
Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunities.

Acting on concerns about delays caused to traffic by the east-west route, the final plans now retain two westbound traffic lanes on Upper and Lower Thames Street and Victoria Embankment, while entirely preserving the continuous, kerb-segregated cycle lanes and junctions.
 
These changes reduce the whole-route traffic delay in the morning peak hour, the worst affected time, by 60 per cent compared to previous proposals.

Responding to the announcement, the 6983 Freight Transport Association (FTA) has voiced its disappointment and concern.
 
FTA has stated that whilst it isn’t opposed to cycle superhighways in principle, it is concerned over the speed that the plans are to be introduced saying that these projects will be in place for decades and more time should be spent now getting all of the aspects understood and correct before work begins.
 
The Association added that the root of the problem is the speed with which the Mayor, Boris Johnson, appears to be pushing the changes through.  FTA raised the point that the environmental impact report and business case were only recently published, when versions of these should have been involved in the consultation, and that the final picture on loading restrictions is still not set.
 
FTA’s head of Urban Logistics Christopher Snelling commented that despite there being ‘positives’ in the announcement today, overall the package of routes still raises cause for concern: “The information published on delay times still does not reflect how industry and private motorists actually use these roads.  And yet the first road-works to build these superhighways will start in just a few weeks’ time.  By this April we will see works underway on all the proposed routes, affecting some key routes into the centre of London.  It seems that the target pushing this is the aim to finish the routes by May 2016 – when the Mayor leaves office.”
 
FTA has also said that there will still be considerable impact on traffic not just on the routes themselves, but also across London and even out to the M25, as TfL re-sequences red lights to make it harder for motor traffic to get on the routes.
 
Snelling added that, given the tight constraints of drivers’ hours rules, this could result in significantly increased costs to the logistics industry, increasing costs for the businesses and residents in London who rely on them.
 
He concluded: “The improvements that have been announced today show how careful work can improve the situation to better reflect the balance of London’s transport needs, and the revised plans issued are an improvement on those previously put out – traffic delays have been reduced somewhat and more loading capacity has been added than was planned before.  TfL has also committed today to work further with the freight industry to refine the loading facilities on the routes before they go live, which we welcome.”

For more information on companies in this article

Related Content

  • Is the US economic stimulus programme working?
    January 30, 2012
    In this third installment in a series of articles exploring the impact of the US economic stimulus programme on the ITS industry, Pete Goldin reports on the ongoing debate in Congress about American Recovery and Reinvestment Act. A debate continues to rage in the US Congress and in the media about the effectiveness of the American Recovery and Reinvestment Act of 2009 (ARRA), and especially the timeliness of the ARRA payments. Some of the arguments seem somewhat partisan in origin while others point out fla
  • MaaS: 130,000 chances for a bad user experience
    May 4, 2020
    Johan Herrlin, CEO of transit data specialist Ito World, puts himself in the hotseat with ITS International to talk about, among other things, why a beautifully designed MaaS app with a perfect subscription model is still a failure if you get your customers lost along the way
  • Car traffic in London is down but congestion is up, says new study
    May 18, 2016
    London Congestion Trends, an in-depth study of the causes of traffic congestion in London between 2012 and 2015 published by Inrix, indicates that congestion in London is increasing, with journey times in Central London growing by 12 per cent annually. Inrix says this is consistent with data that shows that the London economy and population are growing, which normally results in an increase in gridlock. Further, unemployment and fuel prices are down, both of which usually mean a rise in traffic. Despite thi
  • London to have three more fully-electric bus routes
    July 7, 2017
    Transport for London (TfL) and the Mayor of London, Sadiq Khan, have announced three more electric-only bus routes in the city on routes 46, 153 and 214, the latest in a series of measures to tackle London’s toxic air.