Skip to main content

TfL cycle superhighways plans will still disrupt traffic, says FTA

The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
January 28, 2015 Read time: 3 mins
The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes.
 
Subject to approval by 1466 Transport for London, construction of the routes will begin in March.
 
Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunities.

Acting on concerns about delays caused to traffic by the east-west route, the final plans now retain two westbound traffic lanes on Upper and Lower Thames Street and Victoria Embankment, while entirely preserving the continuous, kerb-segregated cycle lanes and junctions.
 
These changes reduce the whole-route traffic delay in the morning peak hour, the worst affected time, by 60 per cent compared to previous proposals.

Responding to the announcement, the 6983 Freight Transport Association (FTA) has voiced its disappointment and concern.
 
FTA has stated that whilst it isn’t opposed to cycle superhighways in principle, it is concerned over the speed that the plans are to be introduced saying that these projects will be in place for decades and more time should be spent now getting all of the aspects understood and correct before work begins.
 
The Association added that the root of the problem is the speed with which the Mayor, Boris Johnson, appears to be pushing the changes through.  FTA raised the point that the environmental impact report and business case were only recently published, when versions of these should have been involved in the consultation, and that the final picture on loading restrictions is still not set.
 
FTA’s head of Urban Logistics Christopher Snelling commented that despite there being ‘positives’ in the announcement today, overall the package of routes still raises cause for concern: “The information published on delay times still does not reflect how industry and private motorists actually use these roads.  And yet the first road-works to build these superhighways will start in just a few weeks’ time.  By this April we will see works underway on all the proposed routes, affecting some key routes into the centre of London.  It seems that the target pushing this is the aim to finish the routes by May 2016 – when the Mayor leaves office.”
 
FTA has also said that there will still be considerable impact on traffic not just on the routes themselves, but also across London and even out to the M25, as TfL re-sequences red lights to make it harder for motor traffic to get on the routes.
 
Snelling added that, given the tight constraints of drivers’ hours rules, this could result in significantly increased costs to the logistics industry, increasing costs for the businesses and residents in London who rely on them.
 
He concluded: “The improvements that have been announced today show how careful work can improve the situation to better reflect the balance of London’s transport needs, and the revised plans issued are an improvement on those previously put out – traffic delays have been reduced somewhat and more loading capacity has been added than was planned before.  TfL has also committed today to work further with the freight industry to refine the loading facilities on the routes before they go live, which we welcome.”

For more information on companies in this article

Related Content

  • Motorcycle Safety Action Plan for London
    March 21, 2014
    The Mayor of London and Transport for London (TfL) have published the capital's first Motorcycle Safety Action Plan designed to directly reduce the number of collisions involving motorcyclists and scooter riders. One of TfL’s top priorities is to reduce by 40 per cent the number of people killed or seriously injured (KSI) on London’s roads by 2020. Recently, the Mayor and TfL published six commitments which, working with a range of partners, are guiding a range of work to deliver this. In particular, ac
  • UK’s first low level cycle signals installed
    January 27, 2014
    The first low level traffic signals specifically designed for cyclists in the UK have been installed in London, following extensive safety trials by Transport for London (TfL) on behalf of the Mayor. Low level cycle signals have been common place in certain parts of Europe for many years, but have never been approved for use in the UK. During off-street trials, which were carried out in partnership with the Department for Transport (DfT) last year, more than 80 per cent of cyclists favoured the use of lo
  • Twenty year vision for Birmingham city transport
    November 14, 2014
    A white paper setting out Birmingham’s 20-year vision for improving transport across the city is set to be unveiled today. Birmingham Connected aims to make the city safer and easier to travel around by reducing congestion and promoting more sustainable forms of transport. Initiatives in the plan include the completion of a US$1.9 billion public transport network within 20 years and the development of Green Travel Districts to enable people to walk, cycle or take public transport safely. A feasibilit
  • Lorries hitting rail bridges peak in October causing hours of delays and cancellations, Network Rail
    October 26, 2017
    Hundreds of thousands of rail passengers will suffer hours of delays and cancellations this month as figures for oversized lorries hitting low bridges (bridge-strikes) peaked in October/ November to around ten reported incidents every day, according to a new campaign by Network Rail. In addition, there are 2,000 bridge strikes every year costing the taxpayer some £23 million ($30 million) in damages and delays.