Skip to main content

TfL cycle superhighways plans will still disrupt traffic, says FTA

The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
January 28, 2015 Read time: 3 mins
The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes.
 
Subject to approval by 1466 Transport for London, construction of the routes will begin in March.
 
Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunities.

Acting on concerns about delays caused to traffic by the east-west route, the final plans now retain two westbound traffic lanes on Upper and Lower Thames Street and Victoria Embankment, while entirely preserving the continuous, kerb-segregated cycle lanes and junctions.
 
These changes reduce the whole-route traffic delay in the morning peak hour, the worst affected time, by 60 per cent compared to previous proposals.

Responding to the announcement, the 6983 Freight Transport Association (FTA) has voiced its disappointment and concern.
 
FTA has stated that whilst it isn’t opposed to cycle superhighways in principle, it is concerned over the speed that the plans are to be introduced saying that these projects will be in place for decades and more time should be spent now getting all of the aspects understood and correct before work begins.
 
The Association added that the root of the problem is the speed with which the Mayor, Boris Johnson, appears to be pushing the changes through.  FTA raised the point that the environmental impact report and business case were only recently published, when versions of these should have been involved in the consultation, and that the final picture on loading restrictions is still not set.
 
FTA’s head of Urban Logistics Christopher Snelling commented that despite there being ‘positives’ in the announcement today, overall the package of routes still raises cause for concern: “The information published on delay times still does not reflect how industry and private motorists actually use these roads.  And yet the first road-works to build these superhighways will start in just a few weeks’ time.  By this April we will see works underway on all the proposed routes, affecting some key routes into the centre of London.  It seems that the target pushing this is the aim to finish the routes by May 2016 – when the Mayor leaves office.”
 
FTA has also said that there will still be considerable impact on traffic not just on the routes themselves, but also across London and even out to the M25, as TfL re-sequences red lights to make it harder for motor traffic to get on the routes.
 
Snelling added that, given the tight constraints of drivers’ hours rules, this could result in significantly increased costs to the logistics industry, increasing costs for the businesses and residents in London who rely on them.
 
He concluded: “The improvements that have been announced today show how careful work can improve the situation to better reflect the balance of London’s transport needs, and the revised plans issued are an improvement on those previously put out – traffic delays have been reduced somewhat and more loading capacity has been added than was planned before.  TfL has also committed today to work further with the freight industry to refine the loading facilities on the routes before they go live, which we welcome.”

Related Content

  • October 8, 2015
    PTV Group retains TfL modelling software contract
    PTV Group has been appointed as one of the framework contractors for three years to provide tactical and microsimulation operational modelling software to Transport for London (TfL). TfL uses PTV Visum operational software for the development of the Operational Network Evaluation (ONE) model, a tactical highway assignment model for London, said to be the largest of its type in the world. An earlier version of the ONE model, covering the central London road network, was successfully used for the operatio
  • October 24, 2018
    London’s zero-emission plan is premature, warns FTA
    Plans to implement a clean air zone in London are premature, says a transport trade body - because zero-emission vehicles are not commercially viable. The Freight Transport Association (FTA) is unimpressed with the City of London Transport Strategy’s ambition to improve air quality and traffic in the east of the capital and the Barbican area by 2022. This draft scheme, which maps out a 25-year framework for managing streets within the City’s ‘Square Mile’, includes establishing a speed limit of 15 mp
  • February 8, 2016
    Better enforcement needed to combat drivers using mobile phones says FTA
    Responding to proposed changes to penalties on drivers using a hand-held mobile phone, the Freight Transport Association (FTA) has said that better enforcement is needed before penalties are increased. After consulting with members at its Road Freight Council Meeting in London yesterday, the FTA stated that the use of modern technology and cameras should be able to enable authorities to improve enforcement and provide evidence against those breaking the law. The recently launched consultation proc
  • April 30, 2013
    London may trial Dutch-style roundabouts
    Roundabouts similar to those used in the Netherlands, which separate cyclists from cars and give them priority, could be used in London as early as next year, subject to government approval, according to Transport for London (TfL). TfL has begun a major cycle safety research project to trial new and innovative junction layouts and traffic technology that, if successful, could be introduced in London and potentially more widely across the UK. The trials, which are being carried out for TfL by the Transport R