Skip to main content

TfL cycle superhighways plans will still disrupt traffic, says FTA

The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes. Subject to approval by Transport for London, construction of the routes will begin in March. Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunit
January 28, 2015 Read time: 3 mins
The Mayor of London, Boris Johnson, has set out final plans for the construction of Europe’s longest substantially-segregated urban cycleways, the centrepiece of his US$1.3 billion commitment to get more Londoners on their bikes.
 
Subject to approval by 1466 Transport for London, construction of the routes will begin in March.
 
Two continuous cycle routes, almost completely separated from traffic, will cross central London from east to west and north to south, opening up thousands of new journey opportunities.

Acting on concerns about delays caused to traffic by the east-west route, the final plans now retain two westbound traffic lanes on Upper and Lower Thames Street and Victoria Embankment, while entirely preserving the continuous, kerb-segregated cycle lanes and junctions.
 
These changes reduce the whole-route traffic delay in the morning peak hour, the worst affected time, by 60 per cent compared to previous proposals.

Responding to the announcement, the 6983 Freight Transport Association (FTA) has voiced its disappointment and concern.
 
FTA has stated that whilst it isn’t opposed to cycle superhighways in principle, it is concerned over the speed that the plans are to be introduced saying that these projects will be in place for decades and more time should be spent now getting all of the aspects understood and correct before work begins.
 
The Association added that the root of the problem is the speed with which the Mayor, Boris Johnson, appears to be pushing the changes through.  FTA raised the point that the environmental impact report and business case were only recently published, when versions of these should have been involved in the consultation, and that the final picture on loading restrictions is still not set.
 
FTA’s head of Urban Logistics Christopher Snelling commented that despite there being ‘positives’ in the announcement today, overall the package of routes still raises cause for concern: “The information published on delay times still does not reflect how industry and private motorists actually use these roads.  And yet the first road-works to build these superhighways will start in just a few weeks’ time.  By this April we will see works underway on all the proposed routes, affecting some key routes into the centre of London.  It seems that the target pushing this is the aim to finish the routes by May 2016 – when the Mayor leaves office.”
 
FTA has also said that there will still be considerable impact on traffic not just on the routes themselves, but also across London and even out to the M25, as TfL re-sequences red lights to make it harder for motor traffic to get on the routes.
 
Snelling added that, given the tight constraints of drivers’ hours rules, this could result in significantly increased costs to the logistics industry, increasing costs for the businesses and residents in London who rely on them.
 
He concluded: “The improvements that have been announced today show how careful work can improve the situation to better reflect the balance of London’s transport needs, and the revised plans issued are an improvement on those previously put out – traffic delays have been reduced somewhat and more loading capacity has been added than was planned before.  TfL has also committed today to work further with the freight industry to refine the loading facilities on the routes before they go live, which we welcome.”

Related Content

  • December 6, 2013
    Pilot for 50 mph limit for HGVs on A9
    Scottish transport minister Keith Brown has announced plans for a 50 mph heavy goods vehicle (HGV) pilot to be introduced at the same time as average speed cameras on Scotland’s A9 road. The trial, which aims to improve the safety and operational performance the route, will go ahead next year alongside a safe driving campaign run by the haulage industry and the A9 Safety Group. In advance of the pilot, the Road Haulage Association will step up their efforts to ensure lorry drivers adhere to safe drivi
  • July 6, 2018
    TfL’s Santander Cycles break hire records
    Transport for London (TfL) says its Santander Cycles were used by record-breaking numbers of people in June (1.2million) and May (1.1m). The capital's heatwave has encouraged more people to explore the city on bicycles, the local government body adds. Santander Cycles met the demand by providing additional bikes at parks and launching a new trial in Westminster and the City which offered more of its models during peak commute times.
  • October 18, 2023
    TfL and Google Maps riding side by side on London cycling
    Google has added hundreds of kilometres of new cycle lane data to its mapping products
  • August 20, 2015
    New system to prevent Hazchem and over-height vehicles entering tunnel
    An impending move to free-flow charging prompted a search for automated dangerous goods identification and over-height detection systems at the Thames Crossing to the east of London. Manned toll booths are increasingly being consigned to history by the onslaught of all-electronic charging. However, a secondary function of the traditional manned plazas has been to prevent non-compliant vehicles using the facility or to tell a driver that that they need to use a specific lane or wait for an escort. Automating