Skip to main content

Ohio River Bridges East End crossing project opened to traffic

The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
December 21, 2016 Read time: 2 mins
The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge.

4089 Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineering consultant and was responsible for contract scope and budget development, design review, and coordination of the six section design consultants. In addition, Parsons was the technical advisor for the implementation of the East End Crossing’s award-winning public-private partnership (P3), which consisted of the development, design, construction, financing, operation, and maintenance of the bridge and approaches in each state. Parsons also served as the project’s toll system advisor.

The project is a long-planned, joint collaboration between the State of Indiana and the Commonwealth of Kentucky to improve cross-river mobility in the Louisville metropolitan area, improve safety, alleviate traffic congestion, and connect highways, all while helping to stimulate the economy of the entire Louisville-Southern Indiana region.

In addition to the new cable-stayed bridge, the Lewis and Clark Bridge project features a shared use pedestrian and bicycle path, new terrain highway and twin 1,700 ft twin bore tunnels under an historic property. The project recently received an Envision Platinum Sustainability Award from the Institute for Sustainable Infrastructure for the project’s exceptional achievements in sustainable infrastructure design, construction, and operations.

All electronic tolling will begin on December 30 on the Lewis and Clark Bridge, the Abraham Lincoln Bridge, and the improved I-65 Kennedy Bridge.

For more information on companies in this article

Related Content

  • TransCore involved in two ITS New York awards
    April 19, 2012
    TransCore has announced it participated in two winning projects announced at the ITS New York 18th Annual Meeting and Technology Exhibition. Of the six projects to receive awards, TransCore participated in the Outstanding Project of the Year in Traffic Control Systems for Integrated Adaptive Traffic Signal Control Decision Support and the Outstanding Project of the Year in Roadway Management for the New York State Thruway's Woodbury Toll Barrier - Highway Speed E-Z Pass system.
  • TRC to open C/AV testing facility in Ohio
    July 22, 2019
    The Transportation Research Center (TRC), an automotive proving ground in North America, has opened a connected and autonomous vehicle (C/AV) testing facility in Ohio. The $45 million site, called SmartCenter, is to test advanced automotive and mobility technologies in a repeatable real-world environment before vehicles are deployed on public highways. Governor John R. Kasich says the centre will allow researchers, developers and manufacturers “to test, build, and deploy advanced mobility solutions
  • IBTTA announces its Toll Excellence Awards
    August 26, 2022
    Trophies will be presented at IBTTA’s Annual Meeting & Exhibition in Austin, TX on 19 September
  • Canadian bridge features sophisticated tolling
    May 16, 2012
    In Canada a new private toll bridge that links Montreal with Laval is now open to traffic. The bridge was opened two months ahead of schedule and features a sophisticated electronic tolling system. Bridge users mount transponders to their vehicles to pay for each crossing.