Skip to main content

Ohio River Bridges East End crossing project opened to traffic

The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
December 21, 2016 Read time: 2 mins
The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge.

4089 Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineering consultant and was responsible for contract scope and budget development, design review, and coordination of the six section design consultants. In addition, Parsons was the technical advisor for the implementation of the East End Crossing’s award-winning public-private partnership (P3), which consisted of the development, design, construction, financing, operation, and maintenance of the bridge and approaches in each state. Parsons also served as the project’s toll system advisor.

The project is a long-planned, joint collaboration between the State of Indiana and the Commonwealth of Kentucky to improve cross-river mobility in the Louisville metropolitan area, improve safety, alleviate traffic congestion, and connect highways, all while helping to stimulate the economy of the entire Louisville-Southern Indiana region.

In addition to the new cable-stayed bridge, the Lewis and Clark Bridge project features a shared use pedestrian and bicycle path, new terrain highway and twin 1,700 ft twin bore tunnels under an historic property. The project recently received an Envision Platinum Sustainability Award from the Institute for Sustainable Infrastructure for the project’s exceptional achievements in sustainable infrastructure design, construction, and operations.

All electronic tolling will begin on December 30 on the Lewis and Clark Bridge, the Abraham Lincoln Bridge, and the improved I-65 Kennedy Bridge.

Related Content

  • April 4, 2023
    Sice systems future proof Fehmarnbelt Tunnel
    Picking up the electro-mechanical contract for the Fehmarnbelt Tunnel was a milestone, according to David Calero Monteagudo, head of global ITS and tunnel business for Spanish company Sice. David Arminas finds out more
  • October 6, 2014
    Parsons Brinckerhoff to design Cleveland’s pedestrian bridge
    Parsons Brinckerhoff, in conjunction with architect Miguel Rosales, has been awarded a contract by Cuyahoga County, Ohio for the conceptual design of a pedestrian and bicycle bridge on the lakefront in Cleveland. Intended to connect Cleveland’s downtown and the lakefront, the bridge will provide convenient access for pedestrians and cyclists and create an iconic structure, symbolising the renewed vibrancy of the lakefront district. The Parsons Brinckerhoff team will develop preliminary plans, includi
  • August 20, 2024
    Fifty-year, $230m toll deal for Kapsch on Louisiana bridge
    Firm will also act as systems integrator for I-10 Calcasieu River Bridge project in US state
  • July 29, 2016
    WSP/Parsons Brinckerhoff named general engineering consultant for US road extension
    The Washington State Department of Transportation (WSDOT) has awarded a contract to WSP/Parsons Brinckerhoff to serve as general engineering consultant on a planned extension of SR 167 in Tacoma. The project will provide a better freight connection between the Port of Tacoma and the Puyallup/White River Valley and also link industrial and urban centres. SR 167 will be extended four miles westward to connect with I-5 and then continue an additional two miles as the SR 509 spur to connect with SR 509 near