Skip to main content

Ohio River Bridges East End crossing project opened to traffic

The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
December 21, 2016 Read time: 2 mins
The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge.

4089 Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineering consultant and was responsible for contract scope and budget development, design review, and coordination of the six section design consultants. In addition, Parsons was the technical advisor for the implementation of the East End Crossing’s award-winning public-private partnership (P3), which consisted of the development, design, construction, financing, operation, and maintenance of the bridge and approaches in each state. Parsons also served as the project’s toll system advisor.

The project is a long-planned, joint collaboration between the State of Indiana and the Commonwealth of Kentucky to improve cross-river mobility in the Louisville metropolitan area, improve safety, alleviate traffic congestion, and connect highways, all while helping to stimulate the economy of the entire Louisville-Southern Indiana region.

In addition to the new cable-stayed bridge, the Lewis and Clark Bridge project features a shared use pedestrian and bicycle path, new terrain highway and twin 1,700 ft twin bore tunnels under an historic property. The project recently received an Envision Platinum Sustainability Award from the Institute for Sustainable Infrastructure for the project’s exceptional achievements in sustainable infrastructure design, construction, and operations.

All electronic tolling will begin on December 30 on the Lewis and Clark Bridge, the Abraham Lincoln Bridge, and the improved I-65 Kennedy Bridge.

For more information on companies in this article

Related Content

  • Transition to all electronic tolling leads to cost savings
    February 2, 2012
    How a temporary congestion-relief solution resulted in the North Texas Tollway Authority's transition to all-electronic toll collection and potential savings of up to $472 million by 2045. By Carla Kienast, ETC Corporation
  • World Bank funds Yemen highway project
    June 6, 2014
    The World Bank has announced a US$133.54 million grant to support the Government of Yemen’s ambitious plan to connect the northern and southern parts of the country with a 710 kilometre highway. The largest ever infrastructure project in Yemen’s history will play a vital role in the country’s transition by targeting the root causes of instability, such as lack of access to economic opportunities and poor national integration, and rebuilding the country’s social and economic base. “This is more than just
  • IBTTA elects Fremier as vice president
    March 8, 2021
    Bay Area Toll Authority's Andrew Fremier to take up 2021 leadership role at IBTTA
  • IBTTA elects first VP
    October 4, 2016
    The International Bridge, Tunnel and Turnpike Association's (IBTTA) has elected Tim Stewart, executive director of the E-470 Public Highway Authority to serve as its first vice president Stewart’s term begins on 1 January 2017; in 2018, Stewart will serve as IBTTA president. As the head of E-470, Stewart provides executive leadership and strategic guidance for all tolling initiatives. Stewart is responsible for the operations of the 47-mile toll road and also the ExpressToll brand, which provides tolling