Skip to main content

Ohio River Bridges East End crossing project opened to traffic

The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
December 21, 2016 Read time: 2 mins
The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge.

4089 Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineering consultant and was responsible for contract scope and budget development, design review, and coordination of the six section design consultants. In addition, Parsons was the technical advisor for the implementation of the East End Crossing’s award-winning public-private partnership (P3), which consisted of the development, design, construction, financing, operation, and maintenance of the bridge and approaches in each state. Parsons also served as the project’s toll system advisor.

The project is a long-planned, joint collaboration between the State of Indiana and the Commonwealth of Kentucky to improve cross-river mobility in the Louisville metropolitan area, improve safety, alleviate traffic congestion, and connect highways, all while helping to stimulate the economy of the entire Louisville-Southern Indiana region.

In addition to the new cable-stayed bridge, the Lewis and Clark Bridge project features a shared use pedestrian and bicycle path, new terrain highway and twin 1,700 ft twin bore tunnels under an historic property. The project recently received an Envision Platinum Sustainability Award from the Institute for Sustainable Infrastructure for the project’s exceptional achievements in sustainable infrastructure design, construction, and operations.

All electronic tolling will begin on December 30 on the Lewis and Clark Bridge, the Abraham Lincoln Bridge, and the improved I-65 Kennedy Bridge.

For more information on companies in this article

Related Content

  • Transport planning consultation is culturally important
    February 2, 2012
    Andrew Bardin Williams explores the efforts under way in North Dakota to consult with native tribes during the early stages of transportation project development. These efforts have led to the signing of a Programmatic Agreement between the state DOT and local tribes and the creation of a tribal consultation committee that allows Native Americans to advise on the identification, evaluation and treatment of historic properties, including those of religious and cultural significance
  • OCTA seeks proposals from three teams for I-405 freeway project
    March 31, 2016
    The Orange County Transportation Authority, California, is seeking proposals from a shortlist of firms for the design and construction of the I-405 Improvement Project, an important step toward building a better freeway that is intended to improve travel times for those driving the corridor between Costa Mesa and the Los Angeles County line. The OCTA Board of Directors has unanimously approved the criteria for selecting a firm to design and build the freeway improvements and approved issuing the final re
  • Automated traffic gates deployed on Auckland infrastructure project
    May 16, 2012
    The Victoria Park Tunnel, a significant infrastructure improvement to connect the Auckland harbour bridge to the Central Motorway in Auckland, New Zealand, has deployed a SwiftGate automated lane closure system. At the heart of the infrastructure project is an additional on-ramp built to increase the accessibility of the northbound highway lanes directly from urban downtown streets. This additional access is only available during peak hours when a movable barrier is shifted out, which meant that the ramp en
  • Mott MacDonald Grontmij JV wins Highways Agency’s framework contract
    November 20, 2014
    The Mott MacDonald Grontmij joint venture (MMG JV) is to provide professional engineering design services to support strategic investment in England’s road network. The JV has been appointed on Lot 1 of the Highways Agency’s new US$7.8 billion Collaborative Delivery Framework (CDF), the country’s largest ever framework for the improvement of motorways and major A roads. The Highways Agency’s CDF is Collaborative working practices and knowledge sharing between designers, the Highways Agency, delivery part