Skip to main content

Ohio River Bridges East End crossing project opened to traffic

The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
December 21, 2016 Read time: 2 mins
The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge.

4089 Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineering consultant and was responsible for contract scope and budget development, design review, and coordination of the six section design consultants. In addition, Parsons was the technical advisor for the implementation of the East End Crossing’s award-winning public-private partnership (P3), which consisted of the development, design, construction, financing, operation, and maintenance of the bridge and approaches in each state. Parsons also served as the project’s toll system advisor.

The project is a long-planned, joint collaboration between the State of Indiana and the Commonwealth of Kentucky to improve cross-river mobility in the Louisville metropolitan area, improve safety, alleviate traffic congestion, and connect highways, all while helping to stimulate the economy of the entire Louisville-Southern Indiana region.

In addition to the new cable-stayed bridge, the Lewis and Clark Bridge project features a shared use pedestrian and bicycle path, new terrain highway and twin 1,700 ft twin bore tunnels under an historic property. The project recently received an Envision Platinum Sustainability Award from the Institute for Sustainable Infrastructure for the project’s exceptional achievements in sustainable infrastructure design, construction, and operations.

All electronic tolling will begin on December 30 on the Lewis and Clark Bridge, the Abraham Lincoln Bridge, and the improved I-65 Kennedy Bridge.

Related Content

  • December 5, 2017
    New Mersey crossing ends Halton’s congestion misery
    Plagued by intolerable congestion but denied government funding for its solution, tiny Halton Borough Council relentlessly pursued its vision and achieved what many believed impossible. Halton may be a small local authority in north west England, but it had a big traffic problem. However, as the road, or more particularly the bridge, involved was not deemed a strategic route, central government would not commission or even fund a solution - a problem that many other local authorities will recognise.
  • January 25, 2022
    Data helps Ohio DoT get grant money
    Ohio Department of Transportation turned to StreetLight Data when it needed to finalise grant money for a key infrastructure link. David Crawford sees how metrics brought in the cash…
  • April 18, 2012
    Key Russian PPP project
    The Northern Capital Highway (NCH) consortium has been named the preferred bidder in the tender for the central section of St Petersburg’s Western High-Speed Diameter (WHSD) project. Should NCH win the tender process it will build and then operate the entire stretch of the toll road. The consortium comprises VTB Capital and Gazprombank from Russia in partnership with Italian company Astaldi and Turkish firm Ictas Insaat.
  • September 10, 2014
    FDOT to rebuild major segment of I-4
    US transportation secretary Anthony Foxx has announced a Transportation Infrastructure Finance and Innovation Act (TIFIA) loan of US$950 million to help pay for the reconstruction and widening of 21 miles of Interstate 4 in metropolitan Orlando, Florida. This is the largest loan the Department has awarded to a public-private partnership (P3). When completed, the project will relieve congestion in one of the country's most heavily-travelled areas. Known as the I-4 Ultimate, the project is part of the 54-y