Skip to main content

Engineering firm unveils I-70 improvement project

International engineering firm Parsons Corp has unveiled its proposed US$3.5 billion project to ease traffic on Interstate 70 through the central mountains in Eagle County, Colorado. Parsons had submitted an unsolicited proposal to Colorado Department of Transportation in 2011. The three-phase project would include tolled express lanes and a bus rapid transit system and be completed as soon as 2021. The express lanes would be reversible to accommodate peak traffic flows to and from the mountains. The proje
July 29, 2013 Read time: 2 mins
International engineering firm 4089 Parsons Corp has unveiled its proposed US$3.5 billion project to ease traffic on Interstate 70 through the central mountains in Eagle County, Colorado.  Parsons had submitted an unsolicited proposal to 5701 Colorado Department of Transportation in 2011.
 
The three-phase project would include tolled express lanes and a bus rapid transit system and be completed as soon as 2021.
 
The express lanes would be reversible to accommodate peak traffic flows to and from the mountains. The project would also straighten some curves on the interstate and resurface the existing lanes.
 
Tunnel bores would have to be added at places such as the Eisenhower Tunnel, and parts of the new lanes would be suspended like the current highway is through Glenwood Canyon.
 
"This is a very, very aggressive schedule," said Jim Bemelen, Parsons' mountain corridor manager. "It's unlikely, but the project could be completed by 2021."
 
"We are very concerned about minimising the footprint as much as possible," said Ralph Trapani, Parsons program director.

For more information on companies in this article

Related Content

  • Platooning with Ease on the I-70
    July 15, 2025
    What would happen to truck platooning - a nascent technology - if the weather turns nasty? The I-70 Truck Automation Corridor Project in the northern US should provide some answers, reports David Arminas…
  • Moxa provides clear vision for Caldecott Tunnel’s Fourth Bore
    September 15, 2014
    Caldecott Tunnel’s new Fourth Bore is utilising a bespoke high-capacity monitoring and communications network from Moxa. The Caldecott Tunnel connects Contra Costa and Alameda counties in Northern California and traditionally it has suffered severe congestion - especially during peak hours. Opened in 1937 as a twin-bore arrangement, by 1964 the increase in traffic volumes led to a third bore being added. Shortly after the third bore was opened a tidal flow was introduced with the centre bore alternating in
  • Rhode Island RhodeWorks plan opposed by ATA
    May 29, 2015
    Rhode Island government (RIDOT) has introduced its RhodeWorks plan, designed to address the state's crumbling transportation infrastructure. Rhode Island ranks 50th out of 50 states in overall bridge condition and has lost 1,200 in the construction sector over the past three months. RhodeWorks is focused on solving these two problems at once.
  • Parsons wins Engineering Excellence Grand Award
    February 14, 2017
    US engineering services firm Parsons has received the 2017 Grand Award in the transportation category from the American Council of Engineering Companies of Missouri for the Columbia I 70 Bridges design build project. Parsons was the lead designer for this US$18 million project for the Missouri Department of Transportation, which involved replacing six deficient bridges with five new weathering steel plate girder bridges while accommodating 80,000+ vehicles per day on the road. Built in 1957, the existing