Skip to main content

Engineering firm unveils I-70 improvement project

International engineering firm Parsons Corp has unveiled its proposed US$3.5 billion project to ease traffic on Interstate 70 through the central mountains in Eagle County, Colorado. Parsons had submitted an unsolicited proposal to Colorado Department of Transportation in 2011. The three-phase project would include tolled express lanes and a bus rapid transit system and be completed as soon as 2021. The express lanes would be reversible to accommodate peak traffic flows to and from the mountains. The proje
July 29, 2013 Read time: 2 mins
International engineering firm 4089 Parsons Corp has unveiled its proposed US$3.5 billion project to ease traffic on Interstate 70 through the central mountains in Eagle County, Colorado.  Parsons had submitted an unsolicited proposal to 5701 Colorado Department of Transportation in 2011.
 
The three-phase project would include tolled express lanes and a bus rapid transit system and be completed as soon as 2021.
 
The express lanes would be reversible to accommodate peak traffic flows to and from the mountains. The project would also straighten some curves on the interstate and resurface the existing lanes.
 
Tunnel bores would have to be added at places such as the Eisenhower Tunnel, and parts of the new lanes would be suspended like the current highway is through Glenwood Canyon.
 
"This is a very, very aggressive schedule," said Jim Bemelen, Parsons' mountain corridor manager. "It's unlikely, but the project could be completed by 2021."
 
"We are very concerned about minimising the footprint as much as possible," said Ralph Trapani, Parsons program director.

For more information on companies in this article

Related Content

  • ARTBA proposes path to breaking gridlock on transportation funding
    March 13, 2015
    The American Road & Transportation Builders Association (ARTBA) has outlined a detailed proposal it believes could end the political impasse over how to fund future federal investments in state highway, bridge and transit capital projects. The ‘Getting beyond gridlock’ plan would marry a 15 cents-per-gallon increase in the federal gas and diesel motor fuels tax with a 100 per cent offsetting federal tax rebate for middle and lower income Americans for six years. The plan, ARTBA says, would fund a US$401 bil
  • Real time active traffic management improves travel times
    July 17, 2012
    Traffic management centres (TMC) have traditionally served to provide surveillance and responses to traffic incidents and recurring and non-recurring changes in road networks. Typically, a TMC collected field data from the roadway and transit infrastructure and provided the integration necessary for operators to see what was happening and then coordinate a response. Standard operating procedures (SOPs) guided operators on how to respond to a given situation. It eventually became impractical for TMC operat
  • Rating agency Standard and Poor Tolling sees a bright future for tolling
    September 6, 2017
    Few disruptions appear on the horizon for global toll road operators, with the US poised to become a better bet for major investment, according to ratings agency Standard and Poor’s (S&P’s) Global Ratings’ 2017 report, which rates toll road operators according to their ability to raise capital. The outlook is generally stable for business conditions and credit quality for toll roads worldwide. One positive exception is the US where the overall outlook is ‘positive’ as S&P expects traffic growth to increase
  • Toll plaza conversion will reduce congestion on I-95
    April 17, 2012
    In an effort to reduce congestion in a busy corridor for motorists and commercial freight carriers, Delaware Department of Transportation (DelDOT) appointed TransCore as the lead integrator on a project to convert the Newark Toll Plaza on I-95, adding two new electronic highway speed lanes on both the north and south bound plazas. Plaza throughput is now about to jump from 250-300 transactions per lane per hour to an estimated 2,000. The US$32 million “shovel ready” project was fully funded through the Amer