Skip to main content

Brisbane expressway opens to traffic

The Legacy Way expressway, in Brisbane, Australia, is now open to traffic. The seven kilometre long expressway is approximately and includes one 4.6 kilometre long twin-tube tunnel connecting the Western Freeway with the Inner City Bypass. Traffic on the expressway is forecast to rise from 34,200 vehicles on an average weekday to 50,800 in 2026. Brisbane City Council (BCC) awarded the contract for the design, construction, operation and maintenance of the seven kilometre long expressway to the Transcity
July 13, 2015 Read time: 2 mins
The Legacy Way expressway, in Brisbane, Australia, is now open to traffic. The seven kilometre long expressway is approximately and includes one 4.6 kilometre long twin-tube tunnel connecting the Western Freeway with the Inner City Bypass. Traffic on the expressway is forecast to rise from 34,200 vehicles on an average weekday to 50,800 in 2026.

Brisbane City Council (BCC) awarded the contract for the design, construction, operation and maintenance of the seven kilometre long expressway to the Transcity joint venture, which awarded 7319 Egis a ten-year contract for operation and maintenance to.

The project includes two separate parallel road tunnels, one for the eastbound traffic and one for the westbound traffic, each with two lane carriageways and connected by cross passages every 120 metres without lay-bys or breakdown bays. It also includes tunnel portals on the Western Freeway at Toowong and the Inner City Bypass at Kelvin Grove, along with the tunnel management system, fire safety, mechanical and electrical systems, ventilation systems, adaptation of existing roads to connect the tunnels to the existing network and a free flow electronic tolling system, which is not part of the contract.

For more information on companies in this article

Related Content

  • Australia highway to receive smart tech 
    October 12, 2021
    Smart motorway tech will be installed between Pine River and Caloundra Road
  • ITS Australia Global Summit 2023: super-sized
    December 2, 2022
    Four-day Global Summit will be held on 28-31 August, 2023 in Melbourne: accelerating smarter, safer, sustainable transport is focus of next year's expanded event for whole ITS community
  • Joining old and new in Canada’s Highway 407
    June 17, 2016
    David Arminas visits Canada’s Highway 407 ETR to see how the concession is working and hear about new arrangements for the roadway’s extension. The Toronto region is North America’s eighth largest metropolitan area and its roads become notoriously congested. In 1997 Highway 407, a 68km concrete toll motorway which skirts the northern edge of Toronto, was opened and initially operated by the province and CHIC - a consortium of four leading Ontario-based companies. Finance came from the Ontario Financing Auth
  • Milton Keynes to trial wirelessly charged electric buses
    September 26, 2012
    In an initiative to enable the quieter, cleaner future of public transport in Milton Keynes, UK, eight organisations led by a subsidiary of Mitsui Europe ("Mitsui") have agreed a five-year collaboration committing to the replacement of diesel buses with their all-electric counterparts on one of the main bus routes in the city by summer 2013. The trial, which could reduce bus running costs by between US$19,500 and US$23,000 per year, is a partnership between Mitsui subsidiary eFleet Integrated Service, Milto